FIG. 141.--Sections of Cofferdam, Van Buren St. Tunnel, Chicago.]
The Van Buren Street tunnel was the last of the three tunnels under the
Chicago River, constructed according to the cofferdam method. At the
time the tunnels were constructed the bed of the river was 17 ft.
deep. In connection with the harbor and river improvements, the Federal
Government ordered the Chicago River to be lowered so as to give a depth
of 26 ft. of water. This necessitated the lowering of the tunnel roof
and the excavation for a deeper floor which was a very difficult
operation. This work was described in “Eng. News,” Sept., 1906.
THE PNEUMATIC CAISSON METHOD.--THE TUNNEL UNDER THE HARLEM RIVER.
In the early seventies Prof. Winkler proposed to construct a tunnel
under the River Danube to connect the various portions of the Vienna,
Austria, underground railway, and to use caissons in the construction.
Prof. Winkler proposed to build caissons from 30 ft. to 45 ft. long,
with a width depending upon the lateral dimensions adopted for the
tunnel masonry. The caisson was to be made of metal plates and angle
iron with riveted connections on all sides except those running
vertically transverse to the tunnel axis, whose connections were to be
bolted. In the middle of the roof an opening was to be left; this was
for the shaft having the air-locks to allow the passage of men,
materials, and compressed air.
Across the river two parallel rows of piles were to be driven into the
river bed, to fix the place where the caisson was to be sunk. Then the
first caisson near the shore was to be lowered in the ordinary way, and
a second caisson was to be immediately sunk very close to the first one.
When both caissons had reached the plane of the tunnel floor, the sides
which were in contact were to be unbolted and removed, and the small
space between made water-tight. The chambers of the two caissons were to
be opened into a single large one communicating above by means of two
shafts. At the same time that the masonry was being built in the first
two caissons, from the inverted arch up, a third caisson was to be sunk;
and when by excavation it had reached the plane of the projected tunnel
floor, the partitions were to be removed so that the three caissons were
in communication, forming a large single caisson. Then the outer
partition of the first caisson was to be removed, and the masonry of the
submarine tunnel connected with the portion of the tunnel built on land.
In a similar manner all the caissons were to be sunk; and when the last
one was placed, and the masonry lining constructed, and connected with
the portion of the tunnel built on the other shore of the river, the
partition walls were to be battered down, and the submarine tunnel
completely constructed and open to traffic.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account