On the concrete bed of the tunnel the segments of the metal lining were
placed and surrounded by concrete, as required by the plans and
specifications (Fig. 145). The contractors had planned to unbolt the
roof from its holdings, to remove by means of dredgers the earth which
had been heaped on it, and thus set the roof afloat, after which it was
to be towed within the two working platforms already erected on the
Bronx shore. But Mr. McBean devised a simpler and more economic, but at
the same time more dangerous, way of constructing this second section of
the tunnel. He thought that the upper half of the tunnel proper could be
used instead of the timber roof, thereby reducing the capacity of the
working chamber, and limiting the use of compressed air. In this way he
dispensed with the removal of timber, and also of the earth heaped on
the roof.
In building this Bronx section, a channel was dredged along the line of
the tunnel to a depth of 5 ft. from the foundation-bed of the proposed
tunnel. The working platforms were constructed on both sides of this
channel, quite similar to those erected on the other half of the tunnel;
and between them pile-bents were sunk, capped with 12-in. by 12-in.
beams. Over the cap-pieces rangers were placed longitudinally, which
also rested on the sides of the wooden working caisson, Fig. 146. The
sheeting-piles were cut off at level, but much lower down than in the
first half of the tunnel.
The roof was built on floats made of 12-in. by 12-in. timber laid
transversely 4 ft. apart and supporting a floor of 3-in. by 12-in.
planks rendered water-tight. The sides of the floats were made by
verticals, 4 ins. by 6 ins., and planks, 3 ins. by 12 ins., carefully
caulked. A temporary floor was built on the base of the float,
consisting of transverse beams, 16 ins. by 16 ins., placed 8 ft. apart.
A center piece, 10 ins. by 16 ins., was laid so as to correspond with
the axis of the tunnel; and on each side of it, other parallel beams, 16
ins. by 16 ins., corresponding to each center of the circular metal
lining of the tunnel; the beams, longitudinal and transversal, were
strongly bolted together. The temporary floor was completed by boarding
the spaces left between the various beams.
[Illustration: FIG. 146.--Showing Sides of the Caisson and Supports for
the Roof.]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account