In the year 1896, Mr. Erastus Wyman secured a patent for building
subaqueous tunnels close to the river, by sinking and joining together
small sections of tunnels previously built on land. Each section would
have been provided with a long vertical tube for the air-lock when
compressed air was to be admitted to expel the water and permit the
construction of the lining within the sunken shell. Thus each section of
the tunnel would have acted as a pneumatic caisson; being, however, an
improvement on Professor Winkler’s suggestion inasmuch as the caisson
was a portion of the tunnel itself, instead of a simple inclosure for
facilitating the construction of the shield. Mr. Wyman proposed to use
this method in the construction of a tunnel between South Brooklyn and
Stapleton, Staten Island; a charter was granted him but the tunnel was
never built.
=The Tunnel under the Seine River.=--The caisson method of building
tunnels under water was used at Paris, France, in the construction of
the Metropolitan Railroad under the Seine River.
The caissons designed by Mr. L. Chagnaud were for a double track line.
They were sunk, ends to ends, and formed a portion of the tunnel lining
which was enveloped by a framework of metal embedded in concrete.
Built-up frames carried a shell of steel plating on the sides, from toes
to springing lines, and on the sides and roof of the working-chamber. A
temporary plate diaphragm closed the open ends. This construction formed
a vessel capable of floating with a very light draft.
The method of sinking the caissons was as follows: The caisson was
erected on the river bank and when completed it was launched and towed
into position between pile stagings which served the double purpose of
guiding the descent at the beginning of the sinking and of forming a
working platform. The caisson when launched and, consequently, before
the cast-iron lining had been put in place within it, weighed 280 metric
tons; but, beyond some difficulty in taking it under the bridges in the
way, the towing was accomplished without serious trouble.
[Illustration: FIG. 149.--Transversal Section of the Caissons for the
Tunnel under the Seine River.]
Previous to placing the caisson in position between the stagings, the
portion of the river bed it was to rest upon had been leveled by
dredging. Once in position, the first work was the erecting of the
cast-iron lining segments within the framework. Work was then begun by
filling the annular space between the lining and the shell with
concrete; this additional weight gradually sunk the caisson to the river
bottom. The working shafts, made up of steel cylinders, were placed as
the sinking progressed to this point.
[Illustration: ~Section A-B.~
~Section C-D.~
~Plan at Joint.~
FIG. 150.--Showing the Joining of the Caissons at the Pont Mirabeau
Tunnel under the Seine River.]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account