When the whole section is filled by the fallen material, the problem may
be considered as the excavation of a new tunnel of short length inside
the old tunnel, and under rather more difficult conditions. The first
task, particularly if men have been imprisoned behind the fallen
material, is to open communication through it between the two uninjured
portions of the tunnel. It is advisable to do this even when there is no
danger to life because of imprisoned workmen, since it enables the work
of repairing to be conducted from both directions. The excavation of a
passageway through the fallen material is rendered difficult, both
because the fallen material is of an unstable character, and also
because it is usually filled with the lining masonry, timbering, etc.
When, therefore, the accident has happened before the full section of
the original material has been removed, the first heading or drift is
driven through this original material rather than through the fallen
débris. Any of the regular soft-ground methods of tunneling may be
employed, but it is usually better to select one which allows the
masonry to be built with as little excavation as possible at first. For
this reason the German method of tunneling is particularly suited to
repair work of this nature. The Belgian method may also be used to
advantage, particularly when the caving extends to the surface of the
ground above, and the upper portion of the débris is, therefore,
practically the same material as that through which the original tunnel
was driven. The greatest defect of the Belgian method for making repairs
is that the roof arch is supported by a rather unstable mass of mingled
earth, stone, and timber, which constitutes the bottom layer of the
fallen material. The method of strutting the work when the German or
Belgian method is used is shown by Fig. 152. It sometimes happens that
the fallen débris is so unstable that it will not carry safely the arch
masonry in the Belgian method or the strutting in the German method, and
in these cases one of the full-section methods of excavation is usually
adopted. The nature of the strutting employed is shown by Fig. 153. When
the section has been opened and the new masonry built, great care should
be taken to fill the cavity behind the masonry with timber or stone; and
should the disturbance reach to the ground surface it is often a good
plan to sink a shaft through the disturbed material, and fill it with
more stable material.
[Illustration: FIG. 153.--Tunneling through Caved Material by Drifts.]
When the fallen débris fills only a part of the section, the first thing
to provide against is the occurrence of any further caving; and this is
usually done by building a protecting roof above the line of the future
roof masonry. Figs. 154 and 155 show two methods of constructing this
temporary roof, which it will be noticed is filled above with cordwood
packing. As soon as the temporary roof is completed, the lining masonry
is constructed.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account