[Illustration: FIGS. 154 and 155.--Filling in Roof Cavity Formed by
Falling Material.]
[Illustration: FIG. 156.--Timbering to Prevent Landslides at Portal.]
(4) Landslides which close the tunnel entrance are repaired in a variety
of ways. Fig. 156 shows a common method of preventing the extension of a
landslide which has been started by the excavation for the entrance
masonry. Fig. 157 shows a method often adopted when the slope is quite
flat and the amount of sliding material is small. It consists
essentially of removing the fallen material and building a new portal
farther back; that is, the open cut is extended and the tunnel is
shortened. When the amount of the sliding material is very large, the
contrary practice of lengthening the tunnel and shortening the open cut,
as shown by Fig. 158, may be adopted.
[Illustration: FIG. 157.--Shortening Tunnel Crushed by Landslide at
Portal.]
=Accidents After Construction.=--Accidents after the completion of the
tunnel may be divided into two classes: first, those which entirely
obstruct the passage of trains, of which the collapse of the roof is the
most common; and second, those which allow traffic to be continued while
the repairs are being made, such as the bulging inward of a portion of
the lining without total collapse. In the first case the first duty of
the engineer is to open communication through the fallen débris, so that
passengers at least may be transferred from one part of the tunnel to
the other and proceed on their way. This is done by driving a heading,
and strongly timbering it to serve as a passageway. If the tunnel is
single tracked this heading is afterwards enlarged until the whole
section is opened. In double-track tunnels the method generally adopted
is to open first one side of the section and timber it strongly, so as
to clear one track for traffic. While the trains are running through
this temporary passageway the other half of the section is opened and
repaired; the traffic is then shifted to the new permanent track, and
the temporary structure first employed is replaced with a permanent
lining. When the accident is such that the repairs can be made without
obstructing traffic entirely, various modes of procedure are followed.
In all cases great care has to be exercised to prevent accident to the
trains and to the tunnel workmen. The work should be done in small
sections so as to disturb as little as possible the already troubled
equilibrium of the soil; the strutting should be placed so as to give
ample clearing space to passing trains, and the trains themselves should
be run at slow speeds past the site of the repairs. To illustrate the
two kinds of accidents and the methods of repairing them, which have
been mentioned, the accidents at the Giovi tunnel in Italy and at the
Chattanooga tunnel in America have been selected.
[Illustration: FIG. 158.--Extending Tunnel through Landslide at Portal.]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account