=Chattanooga Tunnel.=--The Western & Atlantic Ry. passes through the
Chattanooga mountains by means of a single-track tunnel 1,477 ft. long,
constructed in 1848-49. The lining consisted of a brickwork roof arch
and stone masonry side walls. After the tunnel had been opened to
traffic, this lining bulged inward at places, contracting the tunnel
section to such an extent that it was decided to reconstruct the
distorted portions. After careful surveys and calculations had been
made, it was decided to take down and reconstruct about 170 ft. of the
lining.
Owing to contracted space in the tunnel, it was necessary to remove all
men, tools, and material, whenever trains were to pass through; and in
order to do this a work-train of three cars was fitted up with necessary
scaffolds, and supplied with gasoline torches for lighting purposes.
Mortar was mixed on the cars, and all material remained on them until
used. Débris torn out of the old wall was loaded on the cars, and hauled
to the waste dump. A siding was built near the West end of the tunnel
for the use of this train, and a telephone system was installed between
the entrances and the working-train. On account of the contracted
working-space and the greater ease with which brick could be handled,
it was decided to rebuild the walls out of brick instead of stone.
In tearing out the old wall a hole was first cut through the three
bottom courses of the arch and gradually widened. When the opening
became four or five feet long, a small jack was placed near the center
of it and brought to a bearing against the arch to sustain it. After
cutting the opening to a length of from 7 to 10 ft. depending on the
stability of the earth backing, the jack was removed and a piece of 8×16
in. timber placed under the arch and brought up to a bearing with jacks.
One end of the timber rested on the old wall, the other on a seat built
into the adjoining section of new wall. Wedges were then driven under
the ends of timber and the jacks removed. With this timber in place, the
old wall could be taken down with ease, the only trouble being that
small stones and earth fell in from above and behind the arch. This was
obviated by placing a 2 in. plank across the opening and just back of
the 8×16 in. timber. At several points, however, the earth backing was
saturated with water, and it became necessary to put in lagging as the
old wall was removed. This timbering would be taken out as the new work
was built up.
A suitable foundation for the new wall was secured at a depth from 2 to
4 ft., and a concrete footing was used. The section of the new wall was
then built up as near as possible to the 8×16 in. timber; the timber was
then removed and the new wall built up and keyed under the arch.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account