|NAME OF TUNNEL.| DIMENSIONS | DEPTH |PROGRESS|CHARACTER OF|
| | IN FEET. |IN FEET. |IN FEET.| MATERIAL. |
+---------------+------------+---------+--------+------------+
|Hoosac: | | | | |
| East shaft |15.4 × 27.7| 1035 | 21.7 |Mica schist.|
| West shaft | 8 × 16 | 267 | 16.7 |Gneiss. |
|Musconetcong: | | | | |
| Vertical shaft| 8.35 × 16.7| 113.5 | 100 |Loose rock. |
| Inclined shaft| 8.35 × 26 | 304. | 32 |Loose rock. |
+---------------+------------+---------+--------+------------+
The average monthly progress of sinking shafts in treacherous soils may
be assumed to be as follows: clay of first variety, 50 ft. to 75 ft;
clay of second variety, 36.75 to 50 ft; clay of third variety, 23.4 ft.
to 36.75 ft; quicksand, 16.7 ft. to 33.4 ft.
For the reason that the details change with the various conditions
encountered in every work, all the tunnel operations have been treated
in a general way, purposely avoiding to give any detail. Also the rate
of progress and items of cost of tunnels have been given in a broad
manner because they greatly vary in the different works. This
information, however, can be easily obtained by consulting the
Engineering Magazines, where are reported all the tunnel works of
America and Europe, and where are given so many details which are very
valuable to expert engineers in charge of similar works, but not to
students and people who are looking only for general knowledge.
INDEX
Accidents and Repairs in the Belgian Method, 152
Accidents in Tunnels:
After Construction, 308
Baltimore Belt Line, 165
Chattanooga Tunnel, 311
During Construction, 301
General Discussion, 301
Giovi Tunnel, 309
Repairing of, 304
Acetylene Gas Lighting, 334
Air Compressors, Description of, 87
Air Locks, 264-272
Air Pressure, 268
American Method:
General Description, 172
Excavation, 172
Strutting, 174
Hauling, 175
Arrangement of Drill Holes, 90
Artificial Ventilation, 327
Austrian Method of Tunneling:
Advantages and Disadvantages, 180
Excavation, 176
General Description, 176
Lining, 180
Strutting, 177
Average Progress in Tunnels, 342
Baltimore Belt Line Tunnel, General Description, 160
Barlow’s Shield, 242
Beach’s Shield, 246
Belgian Method:
Accidents and Repairs, 152
Advantages and Disadvantages, 152
Excavation, 145
General Description, 144
Lining, 148
Hauling, 150
Strutting, 146
Bench, 131
Bends, 268
Blackwall’s Tunnel Shield, 248
Blasting-cone, 33
Blickford Match, 31
Boston Subway:
General Descriptions, 203
Roof Shield, 251
Boulder Tunnel Relined, 315
Box-cars, 61
Box Strutting, 51
Brandt Drilling Machine, 28, 112
Brown, W. L., 269
Brunel’s Shield, 240
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account