In tunnels built for railroad aqueduct sewer and any other purpose the
thickness of the masonry lining to be allowed for varies with the
material penetrated, as will be explained in a succeeding chapter where
the dimensions for various ordinary conditions are given in tabular
form. The lining masonry is subject to deformation in three ways: by the
sinking of the whole masonry structure, by the squeezing together of the
side walls by the lateral pressures, and by the settling of the
roof-arch. The whole masonry structure never sinks more than three or
four inches, and merits little attention. The movement of the side walls
towards each other, which may amount to three or four inches for each
wall without endangering their stability, has, however, to be allowed
for; and similar allowance must be made for the settling of the
roof-arch, which may amount to from nine inches to two feet, when the
arch is built first as in the Belgian system and rests for some time
upon the loose soil.
CHAPTER III.
EXCAVATING MACHINES AND ROCK DRILLS: EXPLOSIVES AND BLASTING.
=Earth-Excavating Machines.=--Comparatively few of the labor-saving
machines employed for breaking up and removing loose soil in ordinary
surface excavation are used in tunnel excavation through the same
material. Several forms of tunnel excavating machines have been tried at
various times, but only a few of them have attained any measure of
success, and these have seldom been employed in more than a single work.
In the Central London underground railway work through clay a continuous
bucket excavator (Fig. 11) was employed with considerable saving in time
and labor over hand work. In some recent tunnel work in America the
contractors made quite successful use of a modified form of steam
shovel. These are the most recent attempts to use excavating machines in
soft ground, and they, like all previous attempts, must be classed as
experiments rather than as examples of common practice. The Thomson
machine,[4] however, can be employed in any tunnel driven through loose
soil. It occupies a comparatively small space and may easily work when
the timbering is used to support the roof of the tunnel. Steam shovel
instead may give efficient result only in the case that the whole
section of the tunnel is open at once and there are no timbers to
prevent the free swinging of the dipper handle and boom. But in tunnels
through loose soils it is almost impossible to open the whole section at
once without the necessity of supporting the roof. Consequently the use
of steam shovel in loose tunnels is very limited. The shovel, the spade,
and the pick, wielded by hand, are the standard tools now, as in the
past, for excavating soft-ground tunnels.
[4] The machine was designed by Mr. Thomas Thomson, Engineer for
Messrs. Walter Scott & Co.
[Illustration: FIG. 11.--Soft Ground Bucket Excavating Machine: Central
London Underground Railway.]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account