Two Centuries of Shipbuilding by the Scotts at GreenockScotts' Shipbuilding & Engineering Co. Ltd.
History
Two Centuries of Shipbuilding by the Scotts at Greenock
Scotts' Shipbuilding & Engineering Co. Ltd.
Scotts' Shipbuilding & Engineering Co. Ltd.; Shipbuilding -- Great Britain
The advantage of steam navigation for channel service was at once
recognised. A Parliamentary return issued in 1815 showed that for the
space of nine days in the previous year only one mail packet could sail
between Holyhead and Dublin owing to adverse winds, and even then the
average passage was twenty-four hours. Lord Kelvin, in his memorable
Address as Chancellor of the University of Glasgow, in 1905, recalled
the fact that early in the century his father often took three or
four days to cross from Belfast to Greenock in a smack, as she was
frequently becalmed. With favourable winds, rapid passages were made, a
revenue cutter occasionally doing the Belfast and Greenock run in ten
hours.
The Greenock and Belfast route was among the first around the coast to
come under the influence of the mechanical system of propulsion. The
_Rob Roy_, which was the outcome, so far as form of hull was concerned,
of probably the first model experiments ever made--undertaken by David
Napier in the Canal at Camlachie[22]--was in 1818 the pioneer in the
Glasgow and Belfast steam service, and later in the Dover and Calais
steam service.
There followed in 1819 three notable vessels from Scotts' Works: the
_Waterloo_,[23] the _Robert Bruce_, and the _Sir William Wallace_. The
particulars and performances of these vessels, taken from contemporary
records, principally the "Greenock Advertiser," which faithfully
reported each incident in the development of the steamship, are
especially interesting as illustrative of early work.
The _Waterloo_, which, as we have already said, was the largest steamer
of her year (1819), had a beam equal to one-fifth of her length, the
measurement between perpendiculars being 98 ft. 8 in. In addition to
a large number of passengers, she carried under ordinary conditions
a cargo of 100 tons, on a draught of 8 ft. 6 in. against 7 ft. 3 in.
without cargo. Three months were required, between the launch of the
ship and her trials, for the fitting on board of engines each of 30
nominal horse-power, which gave her a speed of between 8 and 9 miles
per hour. Sails, however, were still carried to assist in driving the
ship, and this vessel was of schooner rig. She inaugurated the steam
service between Belfast and Liverpool.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account