Two Centuries of Shipbuilding by the Scotts at GreenockScotts' Shipbuilding & Engineering Co. Ltd.
History
Two Centuries of Shipbuilding by the Scotts at Greenock
Scotts' Shipbuilding & Engineering Co. Ltd.
Scotts' Shipbuilding & Engineering Co. Ltd.; Shipbuilding -- Great Britain
Admiralty and merchant work is initiated in separate drawing-offices.
The "Printed Instructions to Draughtsmen" throws light on the general
principles which influence design, and one or two quotations may be
made:--"Every machine or structure is designed with a certain object in
view; therefore, in designing, keep that object always to the front. Go
straight to the point, and let the object be attained in as simple a
manner as possible. Avoid all curves and indirect lines, except those
conceived to give uniform strength or stiffness, or required for some
definite purpose. There should be a reason for the contour and shape
of every detail. It should be remembered that designs made in this
way, requiring least material for the work to be done, usually look
best. Besides keeping the object clearly to the front, it is necessary
in designing to remember that certain facilities must be attended
to for moulding, machining, and erecting. It is also necessary to
keep in view the circumstances in which the structure or machine is
to be used. Every little detail should be definitely attended to on
the drawings, and not left to the judgment of the men in the shops;
remember that it is usually the unexpected which happens, and that
even the want of a split pin may cause a breakdown. In making drawings
or sketches for ordering material or for the shops, assume that those
who have to interpret the instructions have no knowledge of, or
information concerning, the work in question, except what is contained
in the drawing or order you are making out. This will ensure that all
information issuing from the drawing-office is complete, and that no
work is done in the shops without drawing-office instructions."
The draughtsman, in designing work, must so arrange details as to fully
utilise, as far as is compatible with progress, the special machine
tools available, the system of gauges, templates, and jigs extensively
applied in the shops, and existing patterns. Bonuses are paid for
improvements in design whereby economy may be effected in machine
operations, etc.
There is a large estimating department, where records of costs, rates,
wages, etc., are of the most complete description. The card system
adopted is admirably suited for enabling references to be made at any
time as to the cost of units in any contract. Here also it is possible,
by the simple process of comparison, to effectually check the economy
of design and manufacture, without which a high premium is placed
against efficiency.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account