As to the boiler works, the fact that in 1905 the production was
practically one boiler per week is, of itself, testimony to the nature
of the plant adopted. The main boiler shop, together with its yard, has
an area of 7000 square yards, and a height of 45 ft. to the crane rail,
and is served by five overhead electric cranes, ranging in lifting
power up to 100 tons, with numerous jib and other cranes associated
with the various machine tools.
[Illustration: Plate LIV. IN THE BOILER SHOP.]
The machine tools fitted in the boiler works are all of a very powerful
character; but only a few of these need here be referred to. There
is a 13-ft. gap hydraulic plate-bending machine, which is entirely
automatic in its action, and can be set to any radius to bend plates up
to 2 in. thick when cold. The flanging for the front and back plates
of boilers is done in an hydraulic machine, exerting a pressure of
over 160 tons. This machine has four rams, two of which act downwards,
one upwards, and the other horizontally. It is served by a special
hydraulic jib-crane, capable of lifting the heaviest plates. There are
also plate-edge planers and triple boring mills of corresponding power,
while the vertical rolls take in plates up to 10-ft. wide.
For the riveting of the boilers there is a 13-ft. gap hydraulic
riveting machine, capable of exerting a load on each rivet of 200
tons. The weight of this riveting machine alone is about 60 tons, and
it is served by an independent hydraulic jib-crane. All the valves in
connection with the crane and riveter are led to a common platform, so
that one man is able to manipulate the whole of the work.
There is also a large installation of special plant for the manufacture
of water-tube boilers, but it is scarcely necessary to describe this in
detail.
A large part of the boiler work, especially for warships, is
galvanised, and a special department has been organised for this
purpose. The tubes, in the first place, are thoroughly cleaned, then
placed in a zinc bath, and coated by electrolysis to the desired
extent; the object being to expose defects, as well as to protect the
tubes from corrosion during manufacture. The amount of work done is,
perhaps, the best indication of the equipment of this department, as
well as of the water-tube department; and this will be realised when it
is stated that over 24,000 tubes are required for the boilers of one
cruiser, and that six months suffices for their construction.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account