Uppingham by the Sea: A Narrative of the Year at BorthSkrine, John Huntley
History
Uppingham by the Sea: A Narrative of the Year at Borth
Skrine, John Huntley
Uppingham School
September 15th and 16th were the days of the school's return to Borth. We
slipped at once and easily into the groove of last term's routine,
filling our old quarters and several additional houses. Some building
operations needed for the winter's sojourn have been mentioned by
anticipation. Our medical officer, also, and the ready pickaxe of
"Sanitary Tom" (as the boys called the navvy who was his stout ally), had
been at work laying bare the subterranean geography of our premises and
making all right. At his instance, the proprietor ran out an extended
culvert into the sea beyond low-water mark, a grand engineering work,
which remains the one permanent monument of our settlement. Having in
mind some ancient aspersions on the wholesomeness of Borth we are glad to
bear testimony to the present adequate sanitation of the place.
We do not write for the scientific, and yet we must notice (we hope
without wounding an unprofessional ear) the beautiful economy of natural
forces by which that sanitation is effected. The channel of the Lery,
between which and the sea the hotel is built, runs parallel to the
coastline, till it meets at right angles the estuary of the Dovey. The
same tide which washes the beach also fills the Lery channel and the
adjoining ditches. When the ebb has set in the water in the latter
stands for a time at a higher level than on the beach. Reflecting on
this, our engineers cut a duct between the Lery and the sea, so as to
draw the water from the river down the main drainage artery, performing
twice daily a most effective flushing.
Some of us would have preferred to leave a more dignified memorial of
ourselves, forgetting, perhaps, that it is a Cloaca which is the most
impressive witness to the civilised resources of an ancient king. So an
offer was made to the proprietors that, if they would find the tools and
directors of the work, the school would provide the labourers for the
making of a road between the village and the church, an interval of a
furlong of marshy land, bridged at that time by a makeshift causeway.
They did not, however, see their way to accept our amateur industry, and
the project fell through.
With the arrival of the boys came also news, that on the day before,
September 14th, the engineers had broken ground at Uppingham:
_Ea vox audita laborum_
_Prima tulit finem_.
We had waited not without some impatience for the first sound of the
pickaxe; and its echoes were welcomed as promising an end to our exile.
The new term opened smilingly. The smooth working order into which
everything fell at once contrasted pleasantly with the anxious bustle of
the entry in April. A glorious autumn was settling on the hills, draping
them from head to foot with a red mantle of the withering bracken, which
slowly burnt itself out along their slopes. There was sun and daylight
enough for many rambles along old paths or new ones before the year was
fairly dead.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account