Wakulla: a story of adventure in Florida — John Shaqi
Wakulla: a story of adventure in FloridaMunroe, Kirk
General
Wakulla: a story of adventure in Florida
Munroe, Kirk
Florida -- Fiction
The ropes of the pulley-wheels were made fast to the bow and stern of
the boat, and the forward one was drawn up short, while the other was
left long enough to allow the boat to swing at an angle to the current.
Then the boat was shoved off, and, without any poling, was carried by
the force of the current quickly and steadily to the other side.
A tin horn was attached by a light chain to each post, the ferry was
formally delivered to Master Frank March, and it was declared open and
ready for business.
CHAPTER XII.
THE GREAT MILL PICNIC.
The rates of ferriage were fixed at twenty-five cents for a team,
fifteen cents for a man on horseback, ten cents for a single animal,
and five cents for a foot-passenger. Two cards, with these rates neatly
printed on them by Ruth in large letters, were tacked up on the
anchorage posts, so that passengers might not have any chance to
dispute with the ferryman, or "superintendent of ferries," as he liked
to be called.
Leaving him in charge of the boat--for he was not yet strong enough for
more active work--and leaving Mr. March at work upon the house, Mr.
Elmer, Mark, Jan, and four colored men, taking the mules with them, set
out bright and early on Tuesday morning for the mill, to begin work on
the dam.
They found the pond empty, and exposing a large surface of black mud
studded with the stumps of old trees, and the stream from the sulphur
spring rippling along merrily in a channel it had cut for itself
through the broken portion of the dam. While two men were set to
digging a new channel for this stream, so as to lead it through the
sluice-way, and leave the place where the work was to be done free from
water, the others began to cut down half a dozen tall pines, and hew
them into squared timbers.
A deep trench was dug along the whole length of the broken part of the
dam for a foundation, and into this was lowered one of the great
squared timbers, forty feet long, that had six mortice-holes cut in its
upper side. Into these holes were set six uprights, each ten feet long,
and on top of these was placed as a stringer, another forty-foot
timber. To this framework was spiked, on the inside, a close sheathing
of plank. Heavy timber braces, the outer ends of which were let into
mud-sills set in trenches dug thirty feet outside the dam, were sunk
into the stringer, and the work of filling in with earth on the inside
was begun. In two weeks the work was finished; the whole dam had been
raised and strengthened, the floodgates were closed, and the pond began
slowly to fill up.
In the mean time the saw-mill machinery had been bought, the frame for
the saw-mill had been cut and raised, and Mr. March, having finished
the repairs on the house, was busy setting up the machinery and putting
it in order.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account