Water Supply: the Present Practice of Sinking and Boring Wells: With Geological Considerations and Examples of Wells ExecutedSpon, Ernest
Science
Water Supply: the Present Practice of Sinking and Boring Wells: With Geological Considerations and Examples of Wells Executed
Spon, Ernest
Boring; Water-supply; Wells
The operations were undertaken by Kind under a contract with the
Municipality of Paris, by which he bound himself to complete the works
within the space of twelve months from the date of their commencement,
and to deliver the above quantity of water for the sum of 300,000
francs, 12,000_l_. On the 31st of May, 1857--after the workmen had been
engaged nearly the time stipulated for the completion of the work, and
when the boring had been advanced to the depth of 1732 feet from the
surface--the excavation suddenly collapsed in the upper strata, at about
100 feet from the ground, and filled up the bore. Kind would have been
ruined had the engineers of the town held him to the strict letter of
his contract; but it was decided to behave in a liberal manner, and to
release him from it, the town retaining his services for the completion
of the well, as also the right to use his patent machinery. The
difficulties encountered in carrying the excavation through the clays of
the upper strata were found to be so serious that, under the new
arrangement, it required six years and nine months of continuous
efforts to reach the water-bearing stratum, of which time the far larger
portion was employed in traversing the clay beds. The upper part of this
well was finally lined with solid masonry, to the depth of 150 feet from
the surface; and beyond that depth tubing of wood and iron was
introduced. This tubing was continued to the depth of 1804 feet from the
surface, and had at the bottom a length of copper pipe pierced with
holes to allow the water to enter. At this depth the compound tubing
could not be made to descend any lower; but the engineers employed by
the city of Paris were convinced that they could obtain the water by
means of a preliminary boring; and therefore they proceeded to sink in
the interior of the above tube of 3.2809 feet diameter, an inner tube 2
feet 4 inches diameter, formed of wrought-iron plates 2 inches thick, so
as to enable them to traverse the clays encountered at this zone. At
last, the water-bearing strata were met with on the 24th of September,
1861, at the depth of 1913 feet 10 inches from the ground-line; the
yield of the well being, at the first stroke of the tool that pierced
the crust, 15,000 cubic mètres in 24 hours, or 3,349,200 gallons a day;
it quickly rose to 25,000 cubic mètres, or 5,582,000 gallons a day; and
as long as the column of water rose without any sensible diminution, it
continued to deliver a uniform quantity of 17,000 mètres, or 3,795,000
gallons a day. The total cost of this well was more than 40,000_l._,
instead of 12,000_l._, at which Kind had originally estimated it.
[Illustration: BORING AT GRENELLE, PARIS.
Figs. 259, 260.]
[BORING AT GRENELLE, PARIS--_continued_.
Figs. 261. 262.]
[Illustration: BORING AT PASSY, PARIS.
Figs. 263, 264.]
[Illustration: BORING AT PASSY, PARIS--_continued_.
Figs. 265, 266.]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account