As many as five or six different sized mizers, ranging from 1 foot 6
inches to 9 feet in diameter, can be used successively, the smallest
commencing the excavation, and the larger ones enlarging it until it is
of the requisite size.
[Illustration: Picker.
Figs. 41-43.]
As an accessory, a picker, shown by the three views, Figs. 41 to 43,
Fig. 42 indicating its correct position when in operation, is employed
where the strata is too irregular or compact to be effectually cleared
away by the cutter of the mizer. The picker is fixed upon the same rods
above the mizer, and is used simultaneously, being raised and lowered
with that tool.
[Illustration: Scratcher.
Figs. 44, 45.]
The cutting end of the picker is frequently replaced by a scratcher,
Figs. 44, 45. This useful tool rakes or scratches up the _débris_ thrown
by the mizer beyond its own working range, and causes it to accumulate
in the centre of the sinking, where it is again subjected to the action
of the mizer.
Brick steining is executed either in bricks laid dry or in cement, in
ordinary clay 9-inch work being used for large wells, and half-brick, or
4-1/2-inch work, for small wells.
[Illustration: Brick Steining.
Sectional Plans.
Figs. 46-48.]
Figs. 46 and 47 show the method of laying for 9-inch work, and Fig. 48
for 4-1/2 inches. The bricks are laid flat, breaking joint; and to keep
out moderate land-springs clay, puddle, or concrete is often introduced
at the back of the steining; for most purposes concrete is the best, as,
in addition to its impervious character, it adds greatly to the strength
of the steining. A ring or two of brickwork in cement is often
introduced at intervals, varying from 5 feet to 12 feet apart, to
strengthen the shaft, and facilitate the construction of the well.
Too much care cannot be bestowed upon the steining; if properly executed
it will effectually exclude all objectionable infiltration, but badly
made, it may prove a permanent source of trouble and annoyance. Half the
wells condemned on account of sewage contamination really fail because
of bad steining.
CHAPTER IV.
WELL BORING.
The first method of well boring known in Europe is that called the
Chinese, in which a chisel suspended by a rope and surrounded by a tube
of a few feet in length is worked up and down by means of a spring-pole
or lever at the surface. The twisting and untwisting of the rope
prevents the chisel from always striking in the same place; and by its
continued blows the rock is pounded and broken. The chisel is withdrawn
occasionally, and a bucket or shell-pump is lowered, having a hinged
valve at the bottom opening upwards, so that a quantity of the _débris_
becomes enclosed in the bucket, and is then drawn up by it to the
surface; the lowering of the bucket is repeated until the hole is
cleared, and the chisel is then put to work again.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account