Boring; Water-supply; Wells
The sheer-legs, made of sound Norway spars not less than 8 inches
diameter at the bottom, are placed over the bore-hole for the purpose of
supporting the tackle K K for drawing the rods out of or lowering them
into the hole, when it is advisable to clean out the hole or renew the
chisel. It is obvious that the more frequently it is necessary to break
the joints in drawing and lowering the rods, the more time will be
occupied in changing the chisels, or in each cleaning of the hole, and
as the depth of the hole increases the more tedious will the operation
be. It therefore becomes of much importance that the rods should be
drawn and lowered as quickly as possible, and to attain this end as long
lengths as practicable should be drawn at each lift. The length of the
lift or off-take, as it is termed, depending altogether upon the height
of the lifting tackle above the top of the bore-hole, the length of the
sheer-legs for a hole of any considerable depth should not be less than
30 to 40 feet; and they usually stand over a small pit or surface-well,
which may be sunk, where the clay or gravel is dry, to a depth of 20 or
30 feet. From the bottom of this pit the bore-hole may be commenced, and
here will be stationed the man who has charge of the bore-hole while
working the rods.
[Illustration: Boring Platform.
For Deep or Difficult Wells.
Fig. 84.]
The arrangement, Fig. 84, is intended for either deep or difficult
boring. A regular scaffolding is erected upon which a platform is built.
The boring chisel A is, as in the last instance, coupled by means of
screw-couplings to the boring rods B. At each stroke two men stationed
at E E turn the rod slightly by means of the tiller D D. A rope F, which
is attached to the boring tool, is passed a few times round the drum of
a windlass G, the end of the rope being held by a man at I. When the
handles are turned by the men at L L the man at I pulls at the rope end,
the friction between the rope and the drum of the windlass is then
sufficient to raise the rods and boring tool, but as soon as the tool
has been raised to its intended height the man at I slackens his hold
upon the rope, and as there is insufficient friction on the drum to
sustain the weight of the boring tools, they fall. By a repetition of
this operation the well is bored, and after it has been continued a
sufficient length of time the tiller is unscrewed, and a lifting dog,
attached to the rope from the windlass, is passed over the top of the
rods, and then a short top rod with a shackle is screwed on. The two men
at the windlass draw up the rods as far as the height of the
scaffolding or sheer-legs will allow, when a man at E, Fig. 84, by
passing a hand-dog or a key upon the top of the rod under the lowest
joint drawn above the top of the hole, takes the weight of the rods at
this joint, the men at L having lowered the rods for this purpose; with
another key the rods are unscrewed at this joint, the rope is lowered
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account