The flood volume of the river Chagres has been estimated at 1600 metric
tons of water per second, which is four times the volume of the highest
flood ever measured on the Thames, and the rainfall, as a whole, has
been known to exceed 120 inches in a single year. Besides all this, it
was reported by M. de Lesseps himself,[195] that the borings on the
Culebra range, had reached the depth of 100 feet without having met
with rock. Some engineers have therefore condemned this part of the
plans as faulty, arguing that such a cutting could not be expected to
stand at a slope of one to one, even in a much drier climate—which
means that the cutting through the Culebra would require to assume
greatly larger dimensions, if it were to be of any value.
One of the most serious undertakings connected with the Panama canal
was the proposal to retain the flood waters of the Chagres, by means
of the enormous embankment already referred to, between the Cerro
Gamboa on the south, and the Cerro Barneo on the north, thus raising
the level of the waters from 40 to 45 feet above the river, in order
to allow of their escape. Other two projects were submitted to meet
this difficulty—the first, that of constructing a canal for the
flood waters of the Chagres alongside of the navigable canal; and the
second, that of tapping the Chagres at Matachin, and diverting its
waters to the Pacific. As regards the first of these two alternatives,
it was objected that, as large affluents flow into the river below
Matachin, three parallel canals of large size would require to be
constructed, in order to make the alternative of any real value; the
second alternative, it was held, would afford no relief to the floods
of the Trinidad, the Gatun, and the smaller affluents of the Chagres
below Matachin, while it would be likely to increase the difficulties
of construction at the one end as much as it reduced them at the other.
Nor is it admitted by some authorities that the Gamboa dam would be
likely to answer its purpose. It is contended that many embankments
would be required, instead of only one, and that the construction of
such an embankment from such a cutting could hardly by any possible
effort be completed in twenty-six years, so that it would not be until
after that time had elapsed that the canal could be commenced between
Chagres and Matachin, with its bed 30 feet under sea level.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account