Yorkshire Oddities, Incidents, and Strange EventsBaring-Gould, S. (Sabine)
History
Yorkshire Oddities, Incidents, and Strange Events
Baring-Gould, S. (Sabine)
Legends -- England -- Yorkshire; Yorkshire (England) -- Miscellanea
About the time that this road was finished the building of a bridge was
advertised to be contracted for at Boroughbridge, and a number of
gentlemen met there for that purpose at the Crown Inn. Metcalf, amongst
others, went also. The masons varied considerably in their estimates.
Ostler, the surveyor of the roads, was appointed to survey the bridge,
and Metcalf told him that he wished to undertake it, though he had never
done anything of the kind before.
On this the surveyor acquainted the gentlemen with what Metcalf
proposed; when he was sent for and asked what he knew about a bridge. He
told them that he could readily describe it, if they would take the
trouble of writing down his plan, which was as follows:--"The span of
the arch 18 feet, being a semicircle, makes 27; the arch-stones must be
a foot deep, which, if multiplied by 27, will be 486; and the basis will
be 72 feet more. For the arch, it will require good backing; for which
purpose there are proper stones in the old Roman wall at Aldborough,
which may be brought, if you please to give directions to that effect."
The gentlemen were surprised at his readiness, and agreed with him for
building the bridge. The persons who had given in their estimates were
much offended; and as the stone was to be procured from Renten, a sale
quarry belonging to one of the masons who was there, he was unwilling to
sell any to Metcalf; upon which he went to Farnham, and found good
stones which the lime-burners had left (being too strong for their
purpose), got them dressed at the place for a trifle, conveyed them to
Boroughbridge, and having men to take them off the carts, set them, and
completed the arch in one day.
Soon after, there was a mile and a half of turnpike road to be made
between Knaresborough Bridge and Harrogate, for which Metcalf also
agreed. Going one day over a place covered with grass, he told his men
that he thought it different from the ground adjoining, and would have
them try for stone or gravel, which they immediately did, and found an
old causeway, supposed to have been made in the time of the Romans,
which afforded many materials for the new road. Between the forest
lane-head and Knaresborough Bridge there was a bog in a low piece of
ground. The surveyor thought it impossible to make a road over it, but
Metcalf assured him he could accomplish it. The other then told him that
if so he should be paid as if he had carried the road round the bog.
Jack set about it, cast the road up, and covered it with whin and ling,
and made it as good as any part he had undertaken. He received for his
contract about £400. He afterwards contracted for making five miles of
road between Harrogate and Harewood Bridge, and received for it £1200.
For a mile and a half through part of Chapeltown to Leeds, and for
lengthening the arch of Sheepscar Bridge, he received £400.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account