This canal (according to its present plan) was projected by Col.
T. J. Cram, of the Corps of Engineers, in August, 1866, as the
best method of improving navigation at the mouth of the St. Clair
river. He proposed opening the lower tortuous reach of the south
channel, and making a direct cut from its mouth proper to deep
water in Lake St. Clair. His project was approved, and construction
began on the 20th of August, 1867, under contract with Mr. John
Brown of Thorold, Canada. The original plan was a straight canal
300 feet wide in the clear, and 13 feet deep at low stage of water,
protected by dykes 5 feet in height and 58 feet wide on top, built
of the material dredged from the channel and thrown behind a pile
and timber revetment. The canal was completed in the autumn of
1871, and turned over to the charge of Maj. O. M. Poe, Corps of
Engineers, on the 11th of December. As completed, the banks are
7,221 feet in length, and constructed mostly of dredged sand thrown
behind a revetment consisting of piling in two rows driven 13 feet
apart and parallel, and capped with a timber superstructure 5
feet high, the front row being supplemented with a single row of
sheath-piling to prevent the sand bank from washing back into the
canal. As originally planned, the reverse faces of the embankment
were to be permitted to take their natural slope, but as it was
found that the banks if left so would be gradually washed away,
they were secured eventually by a pile and plank revetment. The
timbers in the superstructure were carbolized to prevent rotting,
but the process proved a disastrous failure, owing to its imperfect
application, and the timbers thus treated are as a general rule
at this date a mere shell with a core of dry rot. The banks were
planted with willows and sodded in some places. The history of
the work since Major Poe took charge, excepting as regards the
deepening of the channel for 200 feet of its width to a depth of 16
feet, as projected by that officer, has been a monotonous routine
of stopping leaks on the canal face, due to the imperfection of the
single row of sheath-piling, which permits the sand to be sucked
through by passing vessels, and propeller-wheels working near the
revetment. These leaks have been stopped from time to time at
various points by various devices, such as marsh sod, etc.... The
deepening of the canal was begun under Major Poe's direction by
contract with Mr. John Brown of Thorold, Canada, in June, 1873, and
finished September 23, 1878, under the direction of Major Weitzel,
who had in the meanwhile relieved Major Poe.
[Illustration: THE SHIP-CANAL AT THE ST. CLAIR FLATS.]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account