Some years ago, the city engineer of Liverpool, Mr. John A. Brodie,
M.Inst.C.E., one of our most enterprising city engineers, essayed a
bigger step forward. He was faced with the disposal of 50,000 tons
of clinker from the city destructors during the year. He made a bold
effort to turn it to economic account in the obvious directions--paving
and kerbing operations--but these channels absorbed only a round 20,000
tons, leaving some 30,000 tons to be shipped to sea to be dumped at a
total annual cost of nearly £4,000--$20,000. The city authorities had
resolved to carry out a tenement building scheme, and the city engineer
decided to provide them in concrete and to use the refuse from the
destructors as the aggregate, exacting tests having convinced him of
its suitability for this purpose.
The building, covering an area of 3,717 square feet, of which total
1,611 square feet are open space, is of three floors with four
tenements on each floor, finished off with a flat roof, surrounded by a
parapet for washing, drying, or playground purposes.
The construction of the building was carried out upon the section or
slab system. That is to say the walls, floors, ceilings, and other
parts, with all necessary openings, were moulded at the destructor
works, and set aside for a time to mature. Some of these slabs were of
imposing dimensions, ranging up to 16 feet in length by 13 feet wide,
14 inches thick and weighing 11 tons. Upon arrival at the site they
were slung into position and dovetailed into place, thus forming a
rigid structure.
As an indication of how modern thought may be hampered severely by
prevailing notions it may be stated that, as a result of his deductions
and experiments, the engineer decided that a thickness of 7 inches
for the walls would be adequate. But his decision was over-ruled. The
existing regulations insisted that brick walls should be 14 inches
thick and the concrete had to comply with these rules. The result
of this indefensible policy, for which misconception and lack of
knowledge were responsible, was to double the weight of the structure
and to inflate the cost of the buildings to an unnecessary degree. The
engineer computed that if construction were carried out upon the lines
he advocated the building could be completed, including the provision
of all necessary plant, for £1,230--$6,150. Enforced compliance with
obsolete rules inflated the cost to £4,072--$20,360. In other words the
ratepayers of Liverpool were compelled to spend £2,842--$14,210--more
than they need have done--a flagrant waste of money, material, time,
labour, and knowledge.