In carrying out the scheme the designer decided to utilize to the full
the available materials upon the spot. This was waste from the adjacent
mines, in the form of cinders, with hydrate of lime to give density and
weather-proofness. Speed in construction being a vital factor, a novel
system was introduced. A railway track was laid around the entire group
of 40 houses. The mixing plant was mounted upon one flat car which
was also equipped with an efficient apparatus to hoist the concrete.
Behind this was a second car carrying the cement, sand, and cinder. The
ingredients were shovelled into the mixer, work being continuous. The
train pulled up before the first pair of houses, the moulds forming
the trough of which were in position. The concrete was hoisted and
discharged into an elevated hopper on the vehicle from which a feed
pipe and spout was extended to the mould trough of the house-wall. The
concrete was run into the trough until it was filled, when the stream
was shut off, the feed pipe lifted, and the train moved on to the next
house, where the cycle of operations was repeated. By the time the
train had completed its circuit and had again reached the first house
the concrete previously poured had hardened sufficiently to permit the
moulds to be raised to form the succeeding trough, and so was ready to
receive another pouring of cement. It will be seen that construction
throughout the 40 houses was not only continuous but each supply of
concrete increased the height of the wall by about 24 inches, or
completed the flooring as the case might be. The building process was
not only exceedingly simple, being free from all complicated mechanism,
but involved the employment of the minimum of labour, which conduced
to extremely cheap erection. The re-setting of the moulds occasions in
this system no difficulty, inasmuch as being hinged they are merely
swung up and automatically fall into position to form the mould. The
work was commenced late in the year 1911 and was completed in the
spring of 1912, having to be suspended during the winter months, when,
of course, all building operations, irrespective of materials used, is
brought to a standstill.
The houses provided in this manner are not only attractive, but are
provided at a price bringing them readily within the reach of the
wage-earner. True, one objection might be levelled against such
standardization as it were, and that is the stereotyped design, but in
this instance this is possible of decided relief by resort to tree,
shrub, and flower embellishment in which individuality is given free
rein, and which effectively breaks up all tendency towards monotony.
But apart from extraneous treatment, the village cannot be described
as being more monotonous than our terrace system of providing homes
for the workers so common to our industrial centres, while even our
much-vaunted garden cities are freely criticized from the general
atmosphere of similarity.