The 2,000,000,000 cubic yards falling a distance of 50 feet
over the dam, estimating the weight of a cubic yard of water
at 500 pounds, and 1 horse-power the energy required to lift
33,000 pounds 1 foot in a minute, would expend energy equal
to over 10,000 horse-power for 8 hours every day in the year,
and produce a constant stream in the bed of the river 26 yards
wide by 1 foot deep, running with a velocity of 5 miles per
hour, to say nothing of the probability that the greater part
of the other two-thirds would find its way again to the river
bed through the earth and air, the whole flowing in a steady,
continuous stream to the mouth of the river, to be used as
required at any season of the year, instead of, as is now the
case, three-fourths of the entire mass of the annual flow going
rapidly to the Gulf in the short period of 75 days untaxed.
Estimating the amount of water required for annual irrigation
at 20 inches, the water reserved for that purpose would be
sufficient for 100,000 acres on each side of the river--all that
could be reclaimed from the desert for 100 miles below.
To carry out this project I recommended to the people on each
side of the Rio Grande that they petition to the executive
authority of their respective nations for the creation of a
joint commission to draw up the necessary treaty stipulations
to protect the work and the rights of all interested in them,
the fundamental feature of which should certainly be that each
nation should have the right to divert no more than one-third of
the flow at any period, and that one-third of the flow should be
maintained in the bed of the river; and that this international
commission have charge and control of the work after completion
as well as during construction.
That the legislative authorities of the two nations be asked to
appropriate, after complete investigation and estimates have
been made, money sufficient to complete the work, probably
$100,000 for the dam proper, $100,000 for the condemnation of
the 50,000 acres of land to be submerged, and $100,000 for the
removal of some 15 miles of the road-bed of the Atchison, Topeka
and Santa Fe Railroad to bluffs above the old bed of the river,
where the track now lies, subject to annual damage, and sooner
or later total destruction, unless removed.