Large tunnels under rivers or tidal estuaries must each be dealt with
according to the particular circumstances of depth below stream-bed,
material to be cut through, length of tunnel, and gradient. The chief
obstacle to be contended against in so much of the river tunnel-work
is the large volume of water which pours into the workings through
fissures in rock or seams of gravel and sand, necessitating the
constant use of most powerful pumps. In ordinary land tunnels the
gradients are generally laid out to fall towards one or both
entrances, and any water finding its way into the excavations may be
led away to the entrances by drains or pipes. On the other hand, in a
river tunnel the gradients generally fall away from the entrances down
towards the centre of the river, and all water coming in must be
pumped out and raised up to at least the level of the river. In places
where the water comes streaming in from many points, any failure or
stoppage of the pumps would place the lives of the miners, and the
security of the work itself, in great jeopardy. Iron shields, or
protection chambers for the miners advancing the excavation, have been
used with great success in carrying on work through loose wet strata
which appeared to defy all other means of progress. Solid rock, chalk,
or compact clay, may present no difficulty so far as they go, but a
continued dip in the gradient, or a line of fault, may suddenly change
the entire course of operations, and require the immediate use of the
most powerful pumping machinery and protective appliances. The special
features of each case will demand special precautions, and the
judgment and inventive powers of the engineer will be severely tested
in coping with the difficulties with which he is surrounded.
CHAPTER III. 182
Permanent way--Rails--Sleepers--Fastenings--and Permanent way laying.
Rails.--Accustomed as we now are to the substantial character of the
permanent way of our railways, we can scarcely realize that in the
earlier examples the rails or tram-plates were made of wood. The first
lines of which we find any record were those constructed to facilitate
the conveyance of coal, iron ore, stone, slate, or other heavy
materials to shipping ports or points of distribution. Speed was a
matter of little importance, the principal object being to introduce a
distinct surface or roadway which would allow a heavier load to be
hauled without increasing the hauling power. As a heavily loaded
wheelbarrow, difficult to move on an ordinary road, can be readily
wheeled along a wooden plank, so it may have been inferred that strong
timber, laid in parallel lines and level and even on the upper
surface, would form a track, or roadway, presenting far less