These simple, independent, hand-worked semaphore signals did good
service for many years, but being independent and in no way physically
connected with one another at junctions, or stations, or with the
switches they were intended to control, it was quite possible for
mistakes to arise where everything depended upon the accuracy and
prompt decision of the signalman. The possibility that such mistakes
could occur, and the certainty that they actually did occur, and too
often with most disastrous results, led gradually to the grouping and
interlocking of a large number of signal levers and switch levers
together in one signal cabin. The advantages of the concentrating and
interlocking of signals and switches are twofold. In the first place,
one man in the signal cabin can work and control the levers for a
large number of switches and signals, where formerly several men were
required to be located at various places in the station-yard; but the
second, and by far the most important advantage, is that with proper
interlocking arrangements it is practically impossible to give
conflicting signals.
With a modern interlocking frame, and assuming the normal position of 315
all the signals to be at _danger_, then before a signal can be
lowered for an approaching engine or train all the switches and
corresponding signals, from any lines or sidings connecting with the
line to be signalled _clear_ must first be set so as to prevent
any engine or train coming out of such connecting lines or switches on
to the line to be made clear. In a similar manner, before the points
and signals can be set to permit an engine or train to pass from a
siding on to the main line all the necessary signals must first be set
to _danger_ to prevent the approach in either direction of any
engine or train on the main line about to be occupied. The mechanical
arrangements of the interlocking frame are so exact and complete as to
effectually prevent any but the proper combination being made. An
untrained or inexperienced signalman might inadvertently attempt to
pull over a wrong lever, only to find it securely locked and immovable
under the control of other levers. The proper sequence of levers must
be made, and the accurately adjusted mechanism automatically prevents
mistakes which formerly occurred with the old hand-worked signals from
the oversight or confusion of the signalman.
The interlocked switches or points are worked from the signal-cabin by
light wrought-iron tubing (termed rodding) or channel-shaped iron bars
supported on fixed iron rollers, and the signals by galvanized wires
running over light pulleys. Modern signals are always weighted at the
signal-post, so that in the event of the breaking of the pulling-wire
they will fly back to their normal position of danger.