Throw-off or _trap points_, are introduced to throw an engine or train
off the rails of a siding on to the ballast, and so avoid a collision
with any other train which may be standing or passing on the line of
rails with which such siding forms a connection. Fig. 484 is a diagram 321
sketch of the arrangement, in which the main-line points are indicated
by the letter A, and the trap points by the letter B; one series of
rodding actuated by one lever in the signal-cabin works both the
main-line points and the trap points at the same time and by the same
movement. The connections are so made that when the points A are set
for the passage of trains on the main line, the trap points B are set
open to throw off on to the ballast, as shown in Fig. 484; and when
the main-line points A are set to allow a train to pass from the
siding on to the main line, the trap points B are closed, as shown on
Fig. 485. A disc or other signal, worked or interlocked with the
points, is placed near B to notify the engine-driver when he may pass
out of the siding on to the main line; but should he from any cause
proceed before the points are properly set and the corresponding
signal given, his engine would run off at the ends of the rails C, C,
and be derailed on to the ballast. The inconvenience caused by such
derailment would be trifling compared with what might result from a
collision with a train standing or passing on the main line. In some
cases the siding is continued onwards for a considerable distance from
the trap-point rails C, C, as indicated by the dotted lines D D, and
terminates with a dead end. When this arrangement can be adopted,
derailment is obviated, and the engine is brought to a stand by a
buffer-stop at the end of siding. On no account should trap points be
placed close to the top edge of a high embankment, or up to the
abutment or wing walls of an under-line bridge, where an engine
running through them accidentally might fall down a considerable
height, and cause serious results. All sidings joining on to main
lines should be trapped as above described, and when properly
signalled and interlocked in the signal-cabin, the traffic-working can
be carried on with increased facility and security.