[Footnote 1: Since the above description was written in 1877 very
extensive alterations have been made in these works. The Company have
completed a large purifying house at the south side of the Creek,
and have had constructed on the site of the Old Institute a dock for
the purpose of admitting steam colliers of 1000 tons burden; and
have erected a coal tramway from the same into the Works, crossing
Nine Elms Lane with an iron bridge 22 feet from the roadway, which
has been widened at least 20 feet. Moreover the carcass of the Old
Flour Water-Mill has been pulled down the only vestiges remaining are
the lock gates. Opposite Mr. Methven's residence a new institute and
stables have been built. In the Works the old offices, workshops,
stores, meter-house, and test rooms have been demolished, the high
shaft pulled down and the jet exhauster removed. A new meter-house has
been erected opposite the engine house and there has also been added
new machinery. The Creek has been narrowed and the portion of ground
recovered has considerably increased the size of the coke yard. A
parapet has been built on both sides of the Creek to prevent the water
from overflowing in the event of extraordinary high tides. Also a new
stage retort house is being erected parallel with retort house No. 6.
(Messrs. Kirk and Randall, Contractors). In addition, three blocks of
new buildings have been erected on the west side of the road within the
principal gate, is B (1) containing coke office, cashier's office and
strong room; timekeeper's office, weigh office, coke foreman's office,
superintendent's office and test room. On the east side of the road
is B (2) containing gate-keeper's lobby and stores. At the south-east
corner of the Works is B (3) consisting of workshops, lobby, etc. The
whole of the three blocks were completed in about four months. (B.
E. Nightingale, Builder and Contractor). The factory bell has been
mounted against one of the columns belonging to the gasholder near the
timekeeper's office, and a gasholder of colossal dimensions is being
erected in the Company's field, Prince of Wales Road. The alterations,
improvements, etc., at these Works within the last ten years have
involved an outlay of about £200,000. _Yard Foreman_, Mr. A. Wilson;
_Carbonizing Foremen_, Messrs. H. Walker, M. Walker, R. Johnston, W.
Taylor, T. Reynolds, G. Feeney; _Purifying Foremen_, Messrs. D. Brown
and H. Aylett; _Foreman of Enginemen_, Mr. G. Wilson; _Coke Foremen_,
Messrs. G. Smith and C. Meredith; _Coal Gang Foreman_, Mr. W. Clowes;
_Timekeeper_, Mr. R. Whitmore. Mr. R. Harvey was foreman over the men
in the carbonizing department and had been upwards of forty years in
the Company's employment, in consideration of his valuable services the
Company have granted him, as they have also several other of their old
and faithful servants, an annuity.]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account