[Sidenote: First entire course removed from the platform.]
The operations at the rock, both in the preparation of the foundation
of the building, and in the fitting up of the railways for landing the
materials, became more and more urgent as the work advanced ashore. The
first course had now been removed from the platform, and the greater
part of the second was laid in its place; and, in the course of three
weeks, it was also expected to be in readiness to ship for the rock,
while a number of the higher courses were in a considerable state of
forwardness. Some of the Aberthaw limestone having been burnt, and
reduced to a state of powder, it was put into casks, while equal
quantities of pozzolano and clean sharp sand were also made up in the
same manner, to be used in building up the inequalities on the south
east or lowest part of the margin of the foundation-pit, that by this
means the water might be more speedily pumped out, and a longer period
of the tide obtained for carrying on the work.
[Sidenote: Trial of the landing apparatus.]
It being apparent, from the present state of things, that we should
be ready for building in the course of the next spring-tides, if
the weather proved favourable, it was necessary to have all the
apparatus for landing the stones at the rock in a working state. While
at Arbroath, the writer had a trial made of one of the new praams
or stone-lighters, by towing her into the bay of Arbroath, with a
large stone upon deck, where the sloop Smeaton had been previously
anchored with her gaff-boom and tackle rigged. This experiment was
made in pretty rough weather, when the block of stone was lifted with
the tackle in and out of the Smeaton’s hold, and again placed on
the praam’s deck, as was to be done in the operation of landing at
the rock. The apparatus is represented in Plate XI., and the trial
was highly satisfactory, the tackle requiring only some trifling
alterations. The Smeaton was then brought into the harbour and trimmed
with ballast, consisting of pieces of granite, neatly fitted into her
hold, over which a platform was laid, which completed her for the
service of taking the stones from Arbroath to the Bell Rock.
[Sidenote: Monday, 20th.]
[Sidenote: Tender sails for the Rock.]
Things on shore having been thus arranged, the writer again embarked on
the 20th in the Sir Joseph Banks Tender, and sailed for the Bell Rock
at 1 P. M., accompanied by the sloop Smeaton, and having on board of
both vessels sixty-two artificers and seamen. At 8 the Floating-light
was hailed, and at 9 the Tender and Smeaton were made fast to their
respective buoys.
[Sidenote: Tuesday, 21st.]
[Sidenote: Fifty-eight artificers land.]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account