The second major portion of the California State planning structure
consists of specific contingency plans (see (4) in figures 1 and 2).
One such plan is prepared for each extraordinary emergency or
disaster, likely to occur, detailing the probable effects of the
emergency on the jurisdiction and the actions to be taken in
offsetting these effects. It is also called a "response plan" since it
describes the operations to be undertaken to deal with catastrophic
situations. Contingency plans include service support plans and
checklists (see (5) and (6) respectively in figures 1 and 2). Each
involved element of the emergency organization details its response
actions in Service Support Plans and itemizes functions appropriate to
the specific contingency. The contingency plans, service support
plans, and related checklists and standard operating procedures
constitute the "operational" portions of the overall emergency plan.
They address internal procedures to accomplish stated objectives and
document, in advance, the specific organizational elements that will
respond to each type of disaster or "need," with identification of
procedures and resources.
The third major part of California's overall State plan is a
compendium of information and resources needed to cope with
emergencies (see (7) in figures 1 and 2). This includes references
describing the control structure (Emergency Operations Center
locations, communications, key facilities, personnel lists, and
equipment source listings).
C. FEDERAL EARTHQUAKE RESPONSE PLANNING
Most Federal agencies operating within the State have a generic
emergency response plan that establishes their internal procedures for
responding to disasters. Certain agencies such as the Corps of
Engineers and the Federal Highway Administration, which provide
services and support that are used on a regular and fairly extensive
basis in disaster, tend to have more highly developed disaster
response plans. Some of them even have rather basic earthquake
response segments included in their basic plans. Thus, for moderate
earthquakes these plans are relatively effective and the Federal
response can be expected to be at least adequate. Few Federal
agencies, however, have developed any specific plan that is adequate
to respond to the demands of a catastrophic event causing property
damage exceeding the $2 billion range. Of 24 Federal agencies whose
earthquake planning status were recently evaluated by FEMA Region IX,
only the Sixth U.S. Army was determined to have developed a
comprehensive capability that is in acceptable detail, has been
exercised, and appears to be operationally adequate and reliable.
Other Federal agencies are now beginning to perceive the need to
improve their planning and response capability following the expected
event, and are gradually responding to this need.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account