The elevation and the extreme purity of the water of the Estanzuela
River made its acquisition very desirable, and the Company, therefore,
purchased the Federal water rights owned by various members of the
Estanzuela community, amounting to 91 liters per sec., and has since
acquired a Federal concession to all the flood-waters of that river. It
was decided, therefore, to adopt the Estanzuela River as the first step
toward developing the water to the south of Monterrey for a
high-pressure supply, the advantage of the scheme being that from time
to time extensions could be made to tap other sources by gravity, as the
demands of the city required. The Estanzuela scheme, therefore, is a
preliminary step toward future extensions which will be necessary in
this direction as the city grows. The springs near El Porvenir, and
others which contribute to the San Juan River, can be tapped at a
sufficiently high level to convey them by a gravity pressure line to the
Estanzuela Aqueduct near Mederos.
The two sources definitely decided on in July, 1907, were those from
Estanzuela and San Geronimo. The works were designed to supply
40,000,000 liters daily, which it was assumed would be sufficient for
all future developments for a population of 200,000 at a per capita
consumption of 200 liters per day. The present requirements of the
city's population, assuming that all the water was supplied by the
Company, would be, at that rate, which is a very liberal one, only
18,000,000 liters daily. This, it was thought, would be easily met by
the San Geronimo source alone, as it was estimated that it would provide
not less than 20,000,000 liters, if the infiltration gallery was driven
far enough into the water-bearing gravels.
The question of a high-pressure water supply for domestic use in a city
like Monterrey is not a serious one, as practically nine-tenths of the
houses are of one story. The increase in the number of large commercial
buildings, however, will make the demand greater in the future, and this
point has been kept in mind in arranging the division of the
distribution systems.
MATERIALS FOR CONCRETE.
_Cement._--In the early stages of construction the cement for the work
was obtained from the Associated Portland Cement Manufacturers, Limited,
of London, which supplied the "Pyramid" brand, from the Knight, Bevan,
and Sturges Works, but later the supply was obtained from a new factory
at Hidalgo, near Monterrey. The total quantity of Portland cement used
was 42,500 bbl. of "Pyramid" and 32,500 bbl. of "Hidalgo." The English
cement was tested for the Water-Works Company in London before shipment
and again at Monterrey, to conform to the British Standard
Specifications; the "Hidalgo" cement was required to pass the Standard
Specifications advocated by the Special Committee of the American
Society of Civil Engineers. The quality in each case was of the very
highest, no difficulties being experienced at any time.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account