ASCE 1193: The Water-Works and Sewerage of Monterrey, N. L., Mexico: The 4th article from the June, 1911, Volume LXXII, Transactions of the American Society of Civil Engineers. Paper No. 1193, Feb. 1, 1911.Conway, G. R. G. (George Robert Graham)
Science
ASCE 1193: The Water-Works and Sewerage of Monterrey, N. L., Mexico: The 4th article from the June, 1911, Volume LXXII, Transactions of the American Society of Civil Engineers. Paper No. 1193, Feb. 1, 1911.
The invert of the concrete conduit where it leaves the Estanzuela River
is 684.25 m. above datum, and at the valve-house of the South Reservoir
it is 589.00 m.
The concrete pipes were manufactured and laid under contract with Mr.
Arthur S. Bent, of Los Angeles, Cal., the Company providing all
materials, labor, etc. The contractor was paid 10 cents per lin. ft. of
pipe manufactured and 10 cents per lin. ft. laid. He was also
responsible for the satisfactory completion of the work.
[Illustration: FIG. 9.--ESTANZUELA PIPE LINE STEEL FORMS FOR THE
MANUFACTURE OF CONCRETE PIPE.]
Fig. 9 shows the details of the joint recommended by Mr. Schuyler and
adopted for these pipes. The 63.5-cm. (25-in.) pipes were 61 cm. long
and 76 mm. (3 in.) thick. The 55.9-cm. (22-in.) pipes were of the same
length, but 70 mm. (2-3/4 in.) thick. For the purpose of strengthening
these pipes while hauling them over very rough roads they were
reinforced with four rings of No. 6 galvanized-iron wire.
_Manufacture of Pipes._--The pipes were manufactured under the
Supervision of Mr. H. Stanley Bent, at a pipe yard established below
the crushing plant, from which the crushed rock and sand were delivered
by gravity in bogies run on narrow-gauge rails. The area of the pipe
yard was approximately 1-1/4 hectares, and it was laid out with parallel
lines of 76-mm. (3-in.) galvanized-iron piping with hose couplings for
sprinkling purposes. After trials with aggregates of various sizes, the
concrete for the pipes was proportioned by volume as follows:
Crushed rock broken to pass through a 19-mm. screen 0.136 cu. m.
Manufactured sand (run of rolls) 0.119 " "
Portland cement 0.090 " "
------------
Total 0.345 cu. m.=
(12.2 cu. ft.)
[Illustration: PLATE III, FIG. 2.--STEEL FORMS FOR MOULDING CONCRETE
TUBES, ESTANZUELA AQUEDUCT.]
The above quantity manufactured two 63.5-cm. pipes; a 55.9-cm. pipe
required 0.1415 cu. m. (5 cu. ft.) of the material, in the same
proportions. Fig. 9 shows the forms for these pipes, and Fig. 2, Plate
III, illustrates the process of moulding. The forms consist of cast-iron
bottom rings, to the proper section of the joint, and inner and outer
steel forms of 3-mm. plate, provided with inner and outer locking
arrangements. The concrete was poured through a cast-iron hopper which
fitted to the top of the outer form.
Public-domain text, read in full here on John Shaqi.