ASCE 1193: The Water-Works and Sewerage of Monterrey, N. L., Mexico: The 4th article from the June, 1911, Volume LXXII, Transactions of the American Society of Civil Engineers. Paper No. 1193, Feb. 1, 1911.Conway, G. R. G. (George Robert Graham)
Science
ASCE 1193: The Water-Works and Sewerage of Monterrey, N. L., Mexico: The 4th article from the June, 1911, Volume LXXII, Transactions of the American Society of Civil Engineers. Paper No. 1193, Feb. 1, 1911.
The concrete, which was mixed very dry, in a 1/2-cu. yd. batch, "Smith"
mixer, was thoroughly tamped with a 22-lb. tamper, and worked until it
was of a stiff jelly-like consistency, the wire rings being added as the
concrete was placed. The best results were obtained with the minimum
quantity of water. The upper joint was moulded with a heavy cast-iron
ring. The jacket and core forms were loosened immediately, and placed
over other rings, a sufficient number of bottom rings being used for a
day's work. For the pipes required for curves, special forms were used
to give the necessary bevel to the joint. After 24 hours the finished
pipes were lifted from the bottom ring with a special lifter, and ranged
in position for coating internally with a Portland cement grout to which
a little freshly slaked lime was added. The pipes were all numbered, and
were kept moist for 10 days by constant sprinkling. They were not hauled
to the work until 28 days after they were moulded, although this rule
was sometimes broken, to the detriment of the pipes. More than 32,000
pipes were manufactured, but some were used for purposes other than the
Estanzuela Aqueduct.
_Cost of Pipes._--The contractor brought with him experienced concrete
pipe makers from California, and these were afterward assisted by
Mexican labor. In a day two tampers could manufacture from 45 to 50
pipes of the larger (63.5-cm,), and from 55 to 60 of the smaller
(55.9-cm.) size.
The cost varied from 2.75 to 3.25 pesos per pipe for the smaller, and
from 3.50 to 4.00 pesos for the larger size.
The approximate cost of manufacturing is as follows: Taking, as a fair
example, one week's work during March, 1908, the wages paid to the 74
men comprising the total pay-roll (though part of this labor was
intermittent) amounted to 981 pesos. This includes a general foreman at
10 pesos per day, four American tampers at 7.50 pesos, and Mexican labor
varying from 4 to 1 peso, and all labor necessary to handle and finish
the pipes, including coating the interiors. During this week there were
made 1,126 of the 63.5-cm. and 1,095 of the 55.9-cm. size. The pay-roll
includes 520 pesos for the larger pipes (46 cents each) and 461 pesos
for the smaller pipe (42 cents each). Table 5 shows the quantities and
cost of the materials used in the manufacture of these pipes.
TABLE 5.--COST OF CONCRETE PIPE.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account