By referring to the cross-section of the secondary beam, it will be
noticed that it is jug-shaped, shelves being left on either side for the
support of the roof forms, which were placed after the secondary beams
had been properly grouted to the radial ones. The lagging was laid
diagonally, so that the short diameter was slightly greater than the
distance between the beams. This greatly facilitated the removal of the
lagging, as it was merely necessary to strike the wedge-shaped fillets
beneath, and turn them clockwise, after tearing out the end lagging.
[Illustration: PLATE IX, FIG. 1.--VIEW OF SEPARATELY MOULDED SECONDARY
BEAMS IN YARD BELOW SOUTH RESERVOIR.]
[Illustration: PLATE IX, FIG. 2.--SETTING PRIMARY BEAMS, SOUTH
RESERVOIR.]
The writer believes that the adoption of forms of this type, rather than
the ordinary kind, led to a saving of lumber of about 400,000 ft. b. m.
During the erection and placing of the concrete, all the joining
surfaces were carefully picked and cleaned, particular care being taken
at the junction of the secondary with the radial beams, and the upper
surfaces of all beams before laying the roof slab.
After the greater part of the roof was completed, the floor was laid in
those sections where it was protected from the sun's rays. The concrete
was placed in two 15-cm. thicknesses, and the work was carried on night
and day, without any joints. The laying of the floor occupied 8 days, or
an average of nearly 100 cu. m. daily.
[Illustration: PLATE X, FIG. 1.--VIEW OF COMPLETED SECTION OF SOUTH
RESERVOIR. EXPANSION JOINTS IN SIDE-WALL NOT YET FILLED.]
_Proportions of Concrete._--All the concrete work was brought to a
smooth face by careful spading, no plastering being used throughout the
reservoir, except in the superstructures. The work was kept well watered
in every case for about 15 days. The whole of the concrete work in
connection with the reservoir was completed in 5-1/2 months. The
concrete for the columns and foundations was a 1:3:5 mixture, the
aggregate consisting of equal parts of 19-mm. (3/4-in.) and 38-mm.
(1-1/2-in.) crushed stone. The remainder of the concrete, except that
for the roof, was a 1:2:4 mixture, the aggregate also consisting of
equal parts of 19-and 38-mm. stone. With the exception of a short length
of the side-walls, the sand used was that manufactured by the Company.
When the crushing plant was unable to produce all the sand required, the
Hornos sand (see Table 3) was used in the side-walls in equal
proportions with the crusher sand.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account