The lowest point to which the water plane dropped was during June and
July, 1909, when the levels stood slightly above 565.00 m., or 5 m.
above the level of the floor of the infiltration gallery. During this
period pumping tests were made in the various wells, and from these it
was quite clear that the infiltration gallery, if carried far enough to
meet them all, would yield a supply of from 25,000,000 to 40,000,000
liters daily. During the great rainfall of August, 1909, the water
levels rose very rapidly; the heavy precipitation between August 9th and
10th caused the level to rise to 568.00 m. in about 4 days, and 6 days
after the great flood of August 27th, the water level, which had
continued rising gradually, reached 571.40 m., and then fell gradually
until at the end of March, 1910, it was practically the same as it had
been from 1902 to 1905.
[Illustration: PLATE XII.--SAN GERONIMO GRAVITY SUPPLY.]
It should be noticed that the readings were taken in the shafts on the
high ground to the west of the present river bed, and were independent
of any flow there might be in the river. During times of ordinary floods
in the river, it was very noticeable that, notwithstanding the fact that
the river water might be turbid to an extreme degree, the well even in
immediate proximity to the river bed did not show the least sign of
discoloration.
_Design of Works._--Plate XII shows the general design of the gravity
scheme, which consists of a main tunnel 550 m. long and a concrete
aqueduct, 1.06 m. (42 in.) in internal diameter and 2,311 m. in length,
discharging into a low-service distributing reservoir at the extreme
western limits of the city. The tunnel and aqueduct were laid on a
gradient of 0.05%, and the latter was designed to discharge 55,000,000
liters per day (22.8 cu. ft. per sec.) if flowing to its full capacity.
_Gravitation Tunnel._--This tunnel, shown on Plate XII and Fig. 13, was
completed prior to driving the infiltration gallery into the
water-bearing gravel, so that the water encountered in the gallery could
be easily drained off by gravity, thus avoiding a heavy outlay for
pumping. The tunnel passes through various strata, the principal ones
being calcareous shale, conglomerate, and gravels. The tunneling
operations were carried on from 5 shafts, No. 1 being 23 m. deep, and
the others varying from 20 to 10 m. The shafts in loose ground were
timbered in the usual way, having clear inside dimensions of 2 m. Shaft
No. 1, which was entirely in shale, was taken out approximately to 3.35
m. in diameter, so as to permit it to be lined with concrete having a
finished internal diameter of 2.43 m.
[Illustration: FIG. 13.--GENERAL DETAILS SAN GERONIMO GRAVITY PIPE LINE.]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account