ASCE 1193: The Water-Works and Sewerage of Monterrey, N. L., Mexico: The 4th article from the June, 1911, Volume LXXII, Transactions of the American Society of Civil Engineers. Paper No. 1193, Feb. 1, 1911.Conway, G. R. G. (George Robert Graham)
Science
ASCE 1193: The Water-Works and Sewerage of Monterrey, N. L., Mexico: The 4th article from the June, 1911, Volume LXXII, Transactions of the American Society of Civil Engineers. Paper No. 1193, Feb. 1, 1911.
Another place in the works where floods have had a damaging effect is the
Estanzuela intake basin, which, when the dam was completed, was filled to
the overflow level in order to test its water-tightness. As this basin,
when cleaned, was found to be slightly fissured on the north side, it was
decided to line it with concrete. As shown in Fig. 8, the lining does not
cover its entire area, but only the central portion, leaving a strip on
either side without protection. The flood of September, 1910, coming in
greater volume than the previous ones of August, 1909, in passing through
the narrow gorge at the entrance, undermined the lining in those places
where it was not founded on solid rock. Figs. 1, 2, and 3, Plate XXXIII,
show some of the damage caused by this flood. The buoyant effect of the
water and the impact of large rolling boulders caused fractures all over
the surface, and lifted the concrete lining bodily; but the dam proper,
being founded on rock bottom, did not suffer any injury. In the future, in
order to avoid the seepage of the ordinary supply, alluded to by the
author, the water will be carried to the valve-house in an open rubble
concrete channel, lined with cement mortar and built high up against the
western hillside. The remainder of the basin will be paved with large
boulders.
[Illustration: PLATE XXXIII, FIG. 1.--ESTANZUELA DAM: BROKEN CONCRETE
BASIN LINING.]
[Illustration: PLATE XXXIII, FIG. 2.--ESTANZUELA DAM: BROKEN CONCRETE
BASIN LINING, EAST SIDE.]
[Illustration: PLATE XXXIII, FIG. 3.--ESTANZUELA DAM SEPT. 26, 1910: VIEW
OF SHEARING FRACTURES OF WALL AND LINING AFTER FLOOD SEPT. 14-17, 1910.]
In conclusion, the writer wishes to emphasize the point that,
notwithstanding the severity of the test, relatively small damage was
inflicted on the extensive works carried out under the author's design and
direction. A test so severe that it caused serious damage and immense
losses in the entire region, washing away kilometers of railroad track and
destroying practically all the bridges within reach of the flood, is an
occurrence of paramount importance, and should be remembered as a leading
factor in the design of engineering works.
GEORGE T. HAMMOND, M. AM. SOC. C. E. (by letter).--In a country, such as
that described in this paper, where water is valuable, and a shortage is
at times possible, where the majority of the population is very poor, and
water and sewage discharge are both to be paid for on a basis of volume,
the question of the expected quantity of daily water supply and sewage
flow per capita is of primary importance. This question, notwithstanding
its difficulty, should be given a first place in the studies for
water-works and sewerage projects, and should never be lost sight of in
the design, which should be such that, while proper for the expected
future flow for a reasonable time, should also be proper and economical
for conditions which at present obtain and may change but slowly.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account