=25. Driving the Sap.=--The sap is driven as follows, viz.: Nos.
1 and 2 dig a ditch 4' 6" deep, 1' 6" wide at bottom, and 3' or more
at top; the berm side has a slope of 3/1, and the reverse is vertical,
or as nearly so as the earth will stand. They leave no berm, as they
need all the cover they can get. Nos. 3 and 4 widen this trench 2 feet
and form a berm of 1' 6" by digging away the foot of the parapet and
throwing the earth upon its top and exterior slope. The head of their
work is kept at 9' in rear of the head of the sap.
The side parapet made by Nos. 1 and 2 is about 2' 6" high and
bullet-proof (about 2' 6" to 3' thick) at 18 inches above the ground.
The head parapet is made up of about 60 sand-bags, from ½ to 2⅔ filled.
It joins the side parapet and extends across the head of the sap. It is
about 2' 6" high.
As the sap is driven forward the head parapet is advanced by throwing
the rear sand-bags over to the front by hand or by the use of the
sand-bag fork. In excavating the trench No. 1 kneels down, undermines,
and digs down enough earth to advance his trench about 9 inches. He
is replaced by No. 2, who shovels this earth upon the side parapet
toward the head of the sap. No. 1 then resumes his place and throws
the sand-bags at the head of the trench over the parapet until he
has uncovered about a foot in advance. He uses a sand-bag fork when
necessary. The trench is advanced 9 inches more in the same manner. No.
2, besides throwing out the earth dug by No. 1, trims up the slopes and
gives the trench its proper width and depth.
Nos. 1 and 2 change places when they have advanced the head of the sap
1' 6", and are relieved as before stated when 3 feet is gained.
Nos. 3 and 4 work together upon their task. In shovelling the earth
upon the parapet they throw it somewhat toward the front and regulate
its height with the scraper. The rate of advance is usually from 2 to 4
feet per hour.
_Widening the Sap._--The sap is widened by working parties, usually of
infantry, who work at about, but not less than, 25 feet in rear of the
head of the sap. In an approach their task is equal in volume to that
of the sappers, and can be finished in one relief. In a parallel when
steps are to be provided, a second relief makes the steps, drainage
ditches, drainage pits, etc.
_A change of direction_ in a full sap (Pl. II, Fig. 20) is made by
No. 1 turning in the new direction and working through the old side
parapet; No 2 throwing the earth over the old head parapet. The
sand-bags of the old are gradually removed and used for a new head
parapet, 20 or 30 additional sand-bags being ready for use if needed
before the others can be safely removed. Nos. 3 and 4 follow on as
before.
A _return_ can be driven back when desired by another detachment of
sappers. No head parapet will be needed, but the side parapet will be
kept a little in advance of the head of the sap.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account