Attack of Fortified Places. Including Siege-works, Mining, and Demolitions.: Prepared for the use of the Cadets of the United States Military Academy — John Shaqi
Attack of Fortified Places. Including Siege-works, Mining, and Demolitions.: Prepared for the use of the Cadets of the United States Military AcademyMercur, James
History
Attack of Fortified Places. Including Siege-works, Mining, and Demolitions.: Prepared for the use of the Cadets of the United States Military Academy
Mercur, James
Defensive (Military science); Military engineering; Offensive (Military science); Siege warfare
The sides of the chamber and entrance are held up by frames 4' 9" high
and 2' 11" wide, outside measurement. The caps are 6" × 5", stanchions
4" × 5", and the ground sills 3" × 5"; sheeting 1" thick is inserted
between the frames and the earth. The covering balks are 9" × 6" and 10
feet long; their tops are flush with the surface of the ground; cleats
nailed on their under side keep the tops of the side frames from being
pushed in by the pressure of the earth. The earth cover is 5 feet high
at the centre and 4 feet at the crest of the outer slope. The passages
are 5' 6" deep, 3' wide at bottom, and 5' at the top. The entrance
is blinded by placing balks across the passage for such part of its
length as may be thought necessary, and extending the earth covering
over them, as shown in the section (Fig. 75). A door, swinging outside,
is hung on the outside frame. Heavy railroad iron may be substituted
for the timber balks with advantage. When thicker balks are used,
or when a second layer is added, the chamber and passage should be
correspondingly deepened.
=64.= =Manner of Executing the Work.=--The powder chamber and
passage are excavated and the frames and balks placed during the first
night, while the central passage of the battery is being constructed.
The excavated earth is thrown out far enough to allow the balks to be
put in position, and is so spread as not to be seen by the defence.
This may be done by one relief of 8 hours, or two reliefs of 4 hours
each. If the work is not completed during the night, the sheeting,
frames, and balks may be placed by day under cover of the earth thrown
out and the existing screens.
The passages are excavated and the earth cover completed on the second
night by two 4-hour reliefs, the first excavating to a depth of 3' 6",
and the second to 5' 6", trimming up the slopes and completing the
work. When necessary, the sides of the passage will be revetted by the
second and a third relief.
When the necessity for great haste exists, the excavation of the
powder-chamber, entrance, and passages may be carried on at the same
time, the excavated earth being thrown in front and on the sides of the
powder-chamber until the balks are in position, and then thrown back
upon them, levelled and rammed.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account