The original wasteway, constructed at the north end of the dam, has
been practically abandoned, having been substituted by a tunnel of
larger capacity. The original wasteway was excavated in the bed rock
of the natural hillside, and although lined with masonry, is not in
the best condition. The author considers its location an objectionable
feature, as menacing the safety of the dam, and thinks it should be
permanently closed.
A wasteway tunnel, 1,487 ft. in length, was constructed in 1888,
through a ridge extending north of the dam. This has a sectional area
of about 10×10 ft., lined with brick masonry throughout, having a grade
of 2½%.
The criticism might be made of the tunnel that it is faulty in design
at the entry or reservoir end, where the water must first fall over
a high spillway wall, aerating the water before entering the tunnel
proper. The water even then has not easy access to the tunnel, and no
adequate arrangements have been made for ventilation, so as to insure
the utilization of its maximum capacity. The maximum depth of water in
the reservoir is about 85 ft., and the full capacity 689,000,000 cu.
ft. of water. The catchment area is 43 square miles, and the surface
of the reservoir when full 436 acres. The outlet pipes are placed in
two tunnels at different elevations through the ridge north of the dam.
There are no culverts or pipes extending through the body of the dam
itself.
Hydraulic-fill Dams.
No discussion of earth dams would be complete without some reference
being made to the novel type of construction developed in western
America in recent years, by which railroad embankments and water-tight
dams are built up by the sole agency of water. The water for this
purpose is usually delivered under high pressure, as it is generally
convenient to make it first perform the work of loosening the earth
and rock in the borrow pit, as well as subsequently to transport them
to the embankment, and there to sort and deposit them and finally part
company with them after compacting them solidly in place, even more
firmly than if compressed by heavy rollers. Sometimes, however, water
is delivered to the borrow pit without pressure, in which event the
materials must be loosened by the plow or by pick and shovel by the
process called ground sluicing in placer mining parlance.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account