The writer in concluding this study wishes to emphasize certain
principles and apparently minor details of construction, which from
observation and personal experience, seem to him of vital importance.
He believes firmly in the truth contained in the following remarks by
Mr. Desmond FitzGerald, of Boston, germane to this subject:
An engineer must be guided by local conditions and the resources at
his command in building reservoir embankments. His design must be
largely affected by the nature of the materials. There are certain
_general principles_, however, which must be observed and which
will be applied by an engineer of skill, judgment and experience to
whatever design he may adopt. It is in the application of these
principles that the services of the professional man becomes
valuable, and it is from a lack of them, that there have been so
many failures.
The details and principles of construction, relating to high earth
dams, may be summarized or stated in order of their application, as
follows:
(1) Select a firm, dry, impermeable foundation, or make it so by
excavation and drainage. All alluvial soil containing organic matter
and all porous materials should be excavated and removed from the
dam site when practicable; that is, where the depth to a suitable
impermeable foundation is not prohibitive by reason of excessive cost.
Wherever springs of water appear, they must be carried outside the
lines of the embankment by means of bed rock drains, or a system of
pipes so laid and embedded as to be permanent and effective.
The drainage system must be so designed as to prevent the infiltration
of water upward and into the lower half of the embankment, and at the
same time insure free and speedy outlet for any seepage water passing
the upper half. All drains should be placed upon bed rock or in the
natural formation selected for the foundation of the superstructure.
They should be constructed in such a manner as to prevent the flow
of water outside the channel provided for it, and also prevent any
enlargement of the channel itself. To this end, cement, mortar, broken
stone, and good gravel puddle are the materials best suited for this
purpose.
(2) Unite the body of the embankment to the natural foundation by means
of an impervious material, durable and yet sufficiently elastic to bond
the two together. When the depth to a suitable foundation is great,
a central trench excavated with sloping sides, extending to bed rock
or other impervious formation, refilled with good puddling material,
properly compacted, will suffice.
When clayey earth is scarce and expensive to obtain, a small amount of
clay puddle confined between walls of brick, stone or concrete masonry,
and extending well into the body of the embankment and so built as
to avoid settlement, will prevent excessive seepage. This form of
construction is not to be carried much above the original surface of
the ground.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account