Engineer Port Repair ShipUnited States. War Department
History
Engineer Port Repair Ship
United States. War Department
Repair ships -- Handbooks, manuals, etc.
(1) _Install navigation aids in entrance channel._ After the harbor
area has been swept of mines by the Navy, the port repair ship marks
the entrance channel with buoys. This is done by soundings and by using
hydrographic charts of the harbor. Soundings are made by the ship’s
fathometer, by lead lines, and by a portable depth finder. The portable
depth finder works on the same principle as the ship’s fathometer
(par. 8) and is installed on one of the two powerboats. The powerboat
operates ahead of the port repair ship, takes continual soundings,
and marks the boundaries of the channel. The crew of the powerboat is
constantly on the alert for underwater obstructions and signals the
ship if any are found and whether the ship must change her course or
stop.
(2) _Blockships._
(_a_) A blockship is a prepared underwater obstacle sunk to prevent
ships from following navigable channels. One or more blockships may be
found in an entrance channel. These ships are often filled with rock or
concrete to make them more difficult to remove.
(_b_) When soundings, intelligence reports, or information received
from the minesweepers indicate the location of a blockship, a diver is
sent down for reconnaissance. The information required to determine the
course of action is—
1. Position blockship is in. That is, is it on its side, at an angle,
or resting on its keel.
2. Approximate size and type of vessel.
3. Nature and extent of its superstructure.
4. Would the removal or destruction of the superstructure leave
enough water between the hull and the surface for large vessels to
use the channel?
[Illustration: _Figure 53. Two half-sunken ships and the bomb crater
in harbor’s seawall and quay show the results of well-planned
destruction._]
5. Nature of bottom and effect of currents.
6. Is ship filled with rock or concrete?
7. Indications of mines and booby traps.
(_c_) This information determines whether the superstructure can be cut
through or flattened with explosives or if the hull has to be broken up
before the channel is cleared. Destroying the hull is a long, difficult
task and should not be attempted if the removal of the superstructure
affords enough clearance.
(3) _Harbor._
(_a_) _General._ When the port repair ship enters the harbor,
her master reports to the port commander for instructions. These
instructions include—
1. What jobs the ship is to do and what priorities have been set on
them.
2. What materials, equipment, power, tools, and personnel the ship is
to furnish the port construction and repair group.
3. Whether temporary construction or repairs are to be made or
permanent repairs made.
4. Surveys to be made of underwater damage and obstructions in harbor
area.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account