Fatigue study : $b the elimination of humanity's greatest unnecessary waste. A first step in motion studyGilbreth, Lillian Moller
Science
Fatigue study : $b the elimination of humanity's greatest unnecessary waste. A first step in motion study
Gilbreth, Lillian Moller
Fatigue; Industrial efficiency; Motion study
If the worker goes home too tired each night, the first method of
remedying this condition is to provide rest periods during the working
day--to set aside time in which he may recover his proper and normal
working strength. One method by which this may be sometimes done is
by shortening the working day. This permits the worker to get into
better condition either before work, after work, during a lengthened
noon hour, or during the “second breakfast” and “tea recess” of many
European organizations. The supposed advantage of this plan is that
it gives little or no jolt to the working process. To this we might
answer, as circumstances vary, that it does give a jolt, because speed
must be increased in order that output should be maintained; or we
might say that the jolt is really needed. The disadvantage, in some
cases, of shortening the working hours is the effect upon the entire
industry in the vicinity. This is a feature to be considered, for in
the long run maximum prosperity is dependent upon largest outputs.
There can be no doubt that in most cases it is advisable and profitable
to shorten working hours, but how and when this is to be done is a
serious problem. In our own office, our stenographers work every other
Saturday till 1:00 P.M. only, and the alternating Saturday they do
not work at all; that is to say, we give them a holiday of Saturday
afternoon and Sunday every other week, and all Saturday and Sunday the
other weeks, besides their regular two-weeks vacation in summer. We
find that we get more and better work as a result. No plant, operating
under the measured type of management, that we know of, has ever
regretted shortening its working hours. It may be that the working
hours formerly existing were so long that shortening the hours was
the only immediate adequate remedy. The danger in shortening hours is
that, if the whole problem is not thoroughly studied, the worker may
not be sure of the same or a larger wage for work which he is able to
do in the shorter time. Fatigue elimination is fundamentally the duty
of the management. The worker cannot afford to pay for the fatigue
elimination, directly or indirectly. Let the short hours be planned
for and assured, but make sure before introducing them that everything
is in such condition that wages can be maintained or raised. This is
a matter requiring study of actual records and not “guess,” “personal
opinion,” or “judgment.”
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account