Another factor which caused difficulty in the administration of the
contract was the position of Adam and Noah Brown. The brothers were
deeply involved in the shipbuilding program on the Lakes, in which they
were associated at times with Henry Eckford. The Browns constructed a
blockhouse, shops, and quarters at Erie; in addition to Perry's two
brigs and five of his schooners, they also built some of the Lake
Ontario vessels and, later, the _Saratoga_ on Lake Champlain. In their
New York yard, whose operation continued throughout the war, they built
some large letter-of-marques: the _General Armstrong_, _Prince de
Neufchatel_, _Zebra_, _Paul Jones_, and some smaller vessels. They also
cut down the 2-decked, merchant ship _China_ into a single flush-deck
letter-of-marque, renamed _Yorktown_; and they had a contract to build
the sloop-of-war _Peacock_. It is remarkable that the Browns could
undertake and complete so much work between 1813 and 1815 and still be
able to build the steam battery in a very short time.
With the contracts in order, the Browns began building. The keels of the
battery were laid June 20, 1814. It is apparent that the Browns prepared
the original hull plans, undoubtedly before the building authority was
obtained. The vessel required only about four months to build; she was
launched October 29, 1814, at 9 a.m. This was an excellent performance,
considering the size of the vessel, the amount of timber required and
handled in her massive construction, and the other work being done by
the builders. During the ship's construction, sightseers were a nuisance
and finally guards had to be obtained. During the building of the steam
battery, work had to be practically stopped on the sloop-of-war
_Peacock_ at one period after she had been partially planked.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account