The first act of Congress providing for the construction of the
building was approved April 15, 1886. Its terms adopted the plan
submitted by Mr. John L. Smithmeyer; created a commission consisting
of the Secretary of the Interior, the Architect of the Capitol
Extension, and the Librarian of Congress, to have charge of and
carry forward the work; and selected the present site. The year 1886
was occupied in appraising and taking possession of the ground; the
next year in clearing the site, making the principal excavation for
the foundations, and laying the drainage system; and the year 1888
in laying one half of the concrete foundation footings on the plan
adopted by the act above mentioned. On October 2, 1888, a new act
of Congress was approved, repealing so much of the act of April
15, 1886, as provided for a commission and the construction of the
building according to the plan therein specified. This act placed the
work under the sole control and management of the Chief of Engineers
of the Army, Brigadier-General Thomas Lincoln Casey, requiring him to
report direct to Congress annually and to prepare general plans for
the entire construction of the building, subject to the approval of
the Secretary of War and the Secretary of the Interior, and within a
total cost of $4,000,000, exclusive of appropriations previously made.
The preparation of the new design was at once entered upon, using
the previous one of Mr. Smithmeyer as a basis by reducing its
dimensions and otherwise considerably modifying it to bring the
cost within the required limit. The new plans were completed and
submitted for approval to the Secretaries on November 23, 1888,
but no action was taken by them. At the same time this design,
together with another modification of the original, retaining the
full dimensions of the building, but modifying its ground-plan and
other architectural features, within and without, in many important
particulars, was placed before Congress. The cost of the building by
the latter design was estimated at $6,003,140, and the time for its
construction at eight years. Toward the close of the session Congress
again took up the subject of plans in connection with the sundry
civil appropriation bill and adopted the larger modified design
by the act approved March 2, 1889, directing that the building be
erected in accordance therewith, and at a total cost not to exceed
$5,500,000, exclusive of appropriations previously made. The amount
of the previous appropriations was $1,000,000, of which a balance
of $745,567.94 remained after the expenses of operations on the old
plan had all been defrayed. Thus the total limit of cost of the new
plan was fixed by law at $6,245,567.94. It may be added that none of
the plans, drawings, or designs made prior to General Casey’s taking
charge of the work were used, all having been new and different.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account