In the meantime many detailed plans of stonework for the exterior
walls, foundations, etc., had been prepared, and the working up of
the details of design and construction in general had been actively
going on in the drafting room, so that all was in readiness for the
prompt and vigorous commencement of operations, which took place on
the ground as soon as Congress had passed the act of March 2, 1889.
In the execution of the work General Casey had the entire responsible
charge under Congress from October 2, 1888, until his death, on March
25, 1896, and he also disbursed the funds during that period. He
held general supervision, gave general direction to all principal
proceedings, and maintained an intimate knowledge of the work
at all times, while performing the duties of his more absorbing
and important office of Chief of Engineers of the Army at the War
Department, to which he succeeded a few months before he was placed
in charge of the Library building by Congress. General Casey had been
connected with some of the most important pieces of construction ever
undertaken by the Government, including the erection of the State,
War and Navy Building and the completion of the Washington Monument.
The last was an especially difficult task, as it had been necessary
to strengthen the old foundations of the shaft before it was possible
to proceed with the work. In this delicate and hazardous undertaking,
as well as in the erection of the State, War and Navy Building, and
other works, General Casey had been assisted by Mr. Bernard R. Green,
C. E., whom he now appointed to be superintendent and engineer of
the construction of the new Library building, and put in full local
charge of the entire work.
To aid in designing the artistic features of the architecture--that
is, exclusive of arrangement, construction, utility, apparatus, and
the management of the business--Mr. Paul J. Pelz was employed under
the immediate direction of General Casey and Mr. Green. Mr. Pelz
had been in partnership with Mr. Smithmeyer in the production of
the original general plan and design. In this way the design of the
building, as it now appears in the main in the exterior and court
walls, the dome, the approaches to the west front, was evolved, Mr.
Pelz thereby fixing the plan and main proportions of the building.
In the spring of 1892 Mr. Pelz’s connection with the work ceased. At
that time the building had reached but little more than one-half its
height.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account