Illustrations of the Croton AqueductTower, F. B. (Fayette Bartholomew)
History
Illustrations of the Croton Aqueduct
Tower, F. B. (Fayette Bartholomew)
Croton Aqueduct (N.Y.)
The minimum flow of water in the river where the dam is constructed,
has been stated to be twenty-seven millions of gallons for every
twenty-four hours. This would be a sufficient supply for one million
of inhabitants, and should the population of the city increase to one
million and a half, this supply, together with the quantity in store,
will probably be sufficient during any season of drought. There is,
therefore, no fear in regard to the supply for the present, and should
the time arrive when the city will require more than the present
facilities afford during low stages of the river, other streams may
be found which can be turned into the upper branches of the Croton,
or into the Aqueduct along its course. Other Reservoirs may also be
constructed farther up the Croton to draw from in seasons of drought.
These suggestions would only be useful to provide a supply during the
low stages of the river, for at other seasons the flow of water in the
Croton would be equal to the full capacity of the Aqueduct.[6]
_General Design of the Channel-way and Reservoirs._
A description of the general design and purpose of the channel-way in
connection with the Reservoirs will serve to give a clear understanding
of the operation of the work. Having ascertained the elevation in
the city at which it would be desirable to use the water, it was
only necessary then, to find a point on the Croton River where a dam
could be constructed that would turn the water into a channel having
a gradual descent to the required elevation at the city. So that it
may easily be conceived, it is only diverting the water into another
channel where it will flow on unobstructed. The manner in which water
is conducted from its natural channel, for the purpose of propelling
the machinery of manufacturing establishments, by a race-way or other
channel, is a simple illustration of the operation of this great work.
At the place where it was determined to build the dam across the
Croton River, the surface of the natural flow of water was about 38
feet below the elevation required as a head for the water to flow into
the Aqueduct leading to the city. By going farther up the river the
dam would have been of less height, and a point might have been found
where it would be only necessary to build a dam to turn the water, and
not form a pond of much extent above it, but for such purpose it would
have been necessary to go above where some important tributaries enter
the river, and would have required a considerable extension of the
Aqueduct. It was perhaps desirable to form this Fountain Reservoir, so
that it would afford a supply of water to draw from, should there at
any future time, in a season of drought, be more required for the use
of the city than would be flowing in the river.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account