Irrigation works : $b the principles on which their design and working should be based, with special details relating to Indian canals and some proposed improvements — John Shaqi
Irrigation works : $b the principles on which their design and working should be based, with special details relating to Indian canals and some proposed improvementsBellasis, E. S. (Edward Skelton)
Science
Irrigation works : $b the principles on which their design and working should be based, with special details relating to Indian canals and some proposed improvements
Bellasis, E. S. (Edward Skelton)
Canals; Irrigation
The spoil in Fig. 8 is shown at a different level from the bank proper,
as it should be to give a neat straight edge to the bank. The width of
the spoil may vary every chain. In Fig. 9 the spoil is raised to avoid
taking up too much land. The spoil presents the best appearance when its
height is kept uniform for as long a length as possible, the width
varying according to necessity, When the height has to be altered, the
change should be made by means of a short ramp. When the spoil is higher
than the road, gaps in it are left at intervals so that rain water can
pass away. When the spoil is heavy for a very short length it can, in
order to avoid a short and unsightly heap, which would result from the
adoption of the section shown in Fig. 9, be placed as in Fig. 8, some of
it being led askew.
The small channel shown outside the bank in Fig. 8 is a watercourse for
enabling trees to be grown. It has, of course, to be graded, and it may
be in cutting or in embankment. If any silt clearances of the canal are
likely to be necessary, the watercourse must be set back to allow room
for the spoil. Such spoil, if sandy, is to a large extent washed down or
blown away and does not accumulate to anything like the extent that
would be expected.[14] Moreover the spoil can extend onto the
watercourse when the trees have grown big, and no longer need watering.
Outside the watercourse is shown the boundary road and the land boundary
pillar. The small channel in Fig. 9 is a drain for rain water. It can be
used as a plantation watercourse if the water is lifted.
[14] This fact has been quoted (_The Pioneer Mail_, “Silt,” 8th March,
1913) as showing that the silt supposed to be cleared is not really
cleared. This may be the case to some extent, but shortage of spoil is
little proof of it.
Where there is no spoil, some extra land, perhaps 20 feet on either
bank, is usually taken up for getting earth from for repairs.
7. =Trial Lines.=--The proposed lines of channel, determined as
explained in Art. 5 should next be laid down on the ground. A line
should consist of a number of straight portions. The curves should not
be put in. Trial pits should be dug at intervals. Some defects in the
line may at once become apparent because the contour map, owing chiefly
to the lines of levels having been taken a considerable distance apart,
is not perfect. A line may pass through a patch of very high or very low
ground or too near to some building or other object with which it is
desirable not to interfere. Alteration may be desirable at a drainage
crossing or at the off-take of a branch. The lines should be corrected
where necessary. Sometimes the corrections may be very considerable.
Allowance can be made for the alterations which will occur when the
curves are laid out. Where there is doubt as to which line is the best,
trial pits may be dug to obtain further information regarding the soil.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account