Irrigation works : $b the principles on which their design and working should be based, with special details relating to Indian canals and some proposed improvementsBellasis, E. S. (Edward Skelton)
Science
Irrigation works : $b the principles on which their design and working should be based, with special details relating to Indian canals and some proposed improvements
Bellasis, E. S. (Edward Skelton)
Canals; Irrigation
The line should now be levelled, careful checks being made, a
longitudinal section of it prepared and the proposed bed, bank and F.S.
level shown. The ground levels ascertained by levelling the line, are
certain to disagree, to some extent, with the contour lines. The latter
were got only by inference from the levels of points in the survey
lines, and they should be corrected in accordance with the fresh levels
now available. If the line does not seem to be the best that can be got,
a fresh line can be marked on the plan and the above procedure repeated.
8. =Final Line and Estimate.=--As soon as the best line seems to have
been found, a large scale plan of the country along its course should be
made by taking bearings or off-sets from points in it to the various
objects and noting where the line cuts them. On this plan will be shown
the exact alignment, the curves being put in and the straight portions
slightly shifted where necessary so that the line may pass at a proper
distance from any buildings or other objects. But before this procedure
is carried out, or while it is being carried out, the estimate for the
work can be prepared from the longitudinal section already taken. Such a
section is of course amply sufficient for a “project estimate,” in which
only approximate figures are given, and it is quite near enough for any
estimate. In the case of small works which have often to be executed
with great promptitude, lamentable delays have occurred owing to the
engineer deferring the preparation of his estimate till he had got the
line exactly fixed. Moreover there is a chance of the labour being
thrown away in case the sanctioning authority directs any change in the
alignment to be made.
In the case of a large scheme, a project estimate is prepared. In this
the earthwork and the area of land to be occupied are calculated pretty
accurately. Designs and estimates are also prepared for the headworks
and for the chief regulators. For works of which there are to be many of
one type--bridges, falls, distributary heads and small drainage
syphons--the cost is arrived at from lump sum figures, one drawing of
each kind being submitted as a type. The distributaries are
approximately estimated at mileage rates. In the case of a small scheme
everything is estimated in detail except perhaps the distributaries or
some of them.
[Illustration: CANAL WITH BRIDGE AND DISTRIBUTARY HEAD.
The Head has Gates and Winches.
_To face p. 61._]
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account