Under these circumstances it was decided to build a new tower on
another convenient ledge, forming part of the main reef, about 120 feet
distant. Sir James Douglass, the Engineer-in-Chief to Trinity House,
completed the designs and personally superintended their execution.
The Smeaton lines were taken as a basis, with one important exception.
Instead of the curve commencing at the foundations, the latter
comprised a perfect cylindrical monolith of masonry 22 feet in height
by 44 feet in diameter. From this base the tower springs to a height
which brings the focal plane 130 feet above the highest spring-tides.
The top of the base is 30 inches above high-water, and the tower’s
diameter at this point being less than that of its plinth, the set-off
forms an excellent landing-stage when the weather permits.
The site selected for the Douglass tower being lower than that chosen
by Smeaton, the initial work was more exacting, as the duration
of the working period was reduced. The rock, being gneiss, was
extremely tough, and the preliminary quarrying operations for the
foundation-stones which had to be sunk into the rock were tedious and
difficult, especially as the working area was limited. Each stone was
dovetailed, not only to its neighbour on either side, but below and
above as well. The foundation-stones were dovetailed into the reef,
and were secured still further by the aid of two bolts, each 1½ inches
in diameter, which were passed through the stone and sunk deeply into
the rock below. The exposed position of the reef enabled work to be
continued only fitfully during the calmest weather, for often when wind
and sea were quiet the rock was inaccessible owing to the swell. Upon
the approach of bad weather everything was made fast under the direct
supervision of the engineer--a man who took no chances.
From the set-off the tower is solid to a height of 25½ feet, except
for two fresh-water tanks sunk in the floor of the entrance-room,
which hold 4,700 gallons. At this point the walls are no less than
8½ feet thick, and the heavy teak door is protected by an outer door
of gun-metal, weighing a ton, both of which are closed during rough
weather.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account