and I have at present nobody else here.... I suppose I shall be obliged
to send Joseph over, for we must not have a bad engine if it can be
helped.... We seem to be getting into our old troubles again.”[285]
[283] Watt to Boulton, 23rd September, 1786.
[284] He spoke of Goodwyn’s Brewery engine, finished in 1784, as
the best that Soho had up to that time turned out--it “performed
wonderful well--not the smallest leak and scarce any noise....
The working gear and joints are the best I ever saw.”
[285] Watt to Boulton, 24th February, 1786.
William Murdock continued, as before, an admirable exception. He was
as indefatigable as ever, always ready with an expedient to remedy a
defect, and willing to work at all hours. A great clamour had been raised
in Cornwall during his stay in London while setting the Albion Mill to
rights, as there was no other person there capable of supplying his place,
and fulfilling his numerous and responsible duties. Boulton deplored that
more men such as Murdock were not to be had;--“He is now flying from mine
to mine,” he wrote, “and hath so many calls upon him that he is inclined
to grow peevish; and if we take him from North Downs, Chacewater, and
Towan (all of which engines he has the care of), they will run into
disorder and ruin; they have not a man at North Downs that is better than
a stoker.”
Towards the end of 1786 the press of orders increased at Soho. A rotative
engine of forty-horse power was ordered by the Plate Glass Company to
grind glass. A powerful pumping-engine was in hand for the Oxford Canal
Company. Two engines, one of twenty and the other of ten horse power, were
ordered for Scotch distilleries, and another order was shortly expected
from the same quarter. The engine supplied for the Hull paper-mill having
been found to answer admirably, more orders for engines for the same
purpose were promised. At the same time pumping-engines were in hand for
the great French waterworks at Marli. “In short,” said Watt, “I foresee
I shall be driven almost mad in finding men for the engines ordered
here and coming in.” Watt was necessarily kept very full of work by
these orders, and we gather from his letters that he was equally full of
headaches. He continued to give his personal attention to the preparation
of the drawings of the engines, even to the minutest detail. On an engine
being ordered by Mr. Morris, of Bristol, for the purpose of driving a
tilt-hammer, Boulton wrote to him,--“Mr. Watt can never be prevailed upon
to begin any piece of machinery until the plan of the whole is settled,
as it often happens that a change in one thing puts many others wrong.
However, he has now settled the whole of yours, but waits answers to
certain questions before the drawings for the founder can be issued.”[286]
[286] Boulton to Morris, 2nd November, 1786.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account