It may well be supposed that Mr. Stephenson’s time was fully occupied in
superintending the extensive, and for the most part novel works,
connected with the railway, and that even his extraordinary powers of
labour and endurance were taxed to the utmost during the four years that
they were in progress. Almost every detail in the plans was directed and
arranged by himself. Every bridge, from the simplest to the most
complicated, including the then novel structure of the “skew bridge,”
iron girders, siphons, fixed engines, and the machinery for working the
tunnel at the Liverpool end, had to be thought out by his own head, and
reduced to definite plans under his own eyes. Besides all this, he had
to design the working plant in anticipation of the opening of the
railway. He must be prepared with waggons, trucks, and carriages,
himself superintending their manufacture. The permanent road,
turntables, switches, and crossings,—in short, the entire structure and
machinery of the line, from the turning of the first sod to the running
of the first train of carriages upon the railway,—were executed under his
immediate supervision. And it was in the midst of this vast accumulation
of work and responsibility that the battle of the locomotive engine had
to be fought,—a battle, not merely against material difficulties, but
against the still more trying obstructions of deeply-rooted mistrust and
prejudice on the part of a considerable minority of the directors.
He had no staff of experienced assistants,—not even a staff of
draughtsmen in his office,—but only a few pupils learning their business;
and he was frequently without even their help. The time of his
engineering inspectors was fully occupied in the actual superintendence
of the works at different parts of the line; and he took care to direct
all their more important operations in person. The principal draughtsman
was Mr. Thomas Gooch, a pupil he had brought with him from Newcastle. “I
may say,” writes Mr. Gooch, “that nearly the whole of the working and
other drawings, as well as the various land-plans for the railway, were
drawn by my own hand. They were done at the Company’s office in Clayton
Square during the day, from instructions supplied in the evenings by Mr.
Stephenson, either by word of mouth, or by little rough hand-sketches on
letter-paper. The evenings were also generally devoted to my duties as
secretary, in writing (mostly from his own dictation) his letters and
reports, or in making calculations and estimates. The mornings before
breakfast were not unfrequently spent by me in visiting and lending a
helping hand in the tunnel and other works near Liverpool,—the untiring
zeal and perseverance of George Stephenson never for an instant flagging
and inspiring with a like enthusiasm all who were engaged under him in
carrying forward the works.” {189}
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Elsewhere in the archive
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account