The first waterworks in London were those constructed by Master Peter
Morrys, a Dutch engineer, in 1582. His plan was to utilise the enormous
force with which the Thames rushed through the nineteen narrow arches
of old London Bridge, and for this purpose the Corporation granted
him a lease of the first arch on the City side for 500 years, at a
rental of 10s. a year, and two years later the second arch was given on
similar terms. In 1701 a third arch was leased to a grandson of Morrys,
and at this time the proprietary rights were sold to Richard Soams, a
goldsmith, for £36,000, who converted it into a Company of 300 shares
of £500 each. In 1761 a fourth arch of the bridge was given to the
Company, and two other arches were closed to give additional force to
the water-wheels. The passage of the narrow arches of the bridge was at
all times difficult, and the process of shooting London Bridge, with a
fall of some five feet through the arch, was not without danger. This
blocking of the bridge caused great complaints, but, nevertheless, the
Company continued to ask for more, and with success, so that in 1767
the first five arches were occupied with immense water wheels, and two
arches on the Surrey side were similarly occupied. We gather that the
Company at this time also possessed a “fire-engine.” The last wheels
were put up under the advice of Brindley and Smeaton. The wheels were
of the undershot variety, and by their power 2,000 gallons of water per
minute were raised to a height of 120 feet, through a pipe which passed
over the tower of St. Magnus’ Church. These wheels continued in use
for 240 years, until 1822, when the Act for rebuilding London Bridge
caused their removal. The pumping machinery was of its kind excellent,
but the mains were very defective, and there was much loss by leakage,
and leakage also caused great damage to the bridge. The chief mains ran
in Bishopsgate Street, Cheapside, Aldgate, Fleet Street, and Newgate
Street. The fact that the London Bridge Waterworks were in use until
1822 is important, as showing that the Thames water up to that time was
not so grossly impure as to preclude the possibility of distributing
it for household purposes without filtration. It is not conceivable
that such a course could be adopted at the present day. The impurities
of Fleet Ditch were due to slop water, and to material negligently
thrown into it, and it was probable that only during a sharp shower,
when the filth of the streets was washed into it, it reached that
state of impurity which Swift has described. Water-carried sewage,
as we understand it, was not then in common use, and cesspools were
not allowed to empty into the sewers; and Public Authorities were not
expected to relieve individuals of responsibility and to undertake
duties, the satisfactory accomplishment of which is impossible.
Public-domain text, read in full here on John Shaqi.
Reviews
Reviews
No reviews yet
Be the first to share your thoughts on this work.
Join the Discussion
Join the discussion
Sign in to leave a comment or review.
Sign InorCreate an account